[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384662":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},384662,165,1,"单选题","某公司对本单位负责的信息系统集成项目实施失败原因进行分析后，发现约80%的原因都是用户需求不明确、授权不清晰、以及采用了不适宜的技术，而其他十几种原因造成的失败较少。根据这些分析结果，该公司所采用项目质量控制的方法是（）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","散点图法",false,{"key":16,"text":17,"correct":14},"B","直方图法",{"key":19,"text":20,"correct":21},"C","帕累托法",true,{"key":23,"text":24,"correct":14},"D","控制图法","帕累托法，二八原则，找关键原因，做最有价值的事情。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]