[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384648":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},384648,165,1,"单选题","某系统集成公司制订了一系列完备的质量管理制度，其中一项是要求每个项目在各个阶段的最后都必须进行质量审计。这种审计活动是（）过程的一部分工作。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","质量保证",true,{"key":16,"text":17,"correct":18},"B","质量改进",false,{"key":20,"text":21,"correct":18},"C","质量控制",{"key":23,"text":24,"correct":18},"D","质量计划","质量保证和质量控制的区别：质量保证一般是每隔一定的时间进行，例如阶段末期，主要通过系统的质量审计来保证项目的质量；质量控制是实时监控项目的具体结果，以判断他们是否符合项目的相关标准，制定有效方案，以消除产生质量问题的原因。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]