[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384597":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},384597,165,1,"单选题","某公司有一个项目，发生的财包括： 1. 项目团队人员工作50万元 2. 项目团队差旅费10万元 3. 项目税金10万元 4. 项目分摊公司保卫费5万元 5. 项目物料及设备使用费20万元 其中直接成本包括（ ）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","12345",false,{"key":16,"text":17,"correct":14},"B","123",{"key":19,"text":20,"correct":21},"C","125",true,{"key":23,"text":24,"correct":14},"D","1324","团队成员工资、团队差旅费和物料及设备使用费用是直接成本，税金是间接成本，保卫费是间接成本",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]