[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384557":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},384557,165,1,"单选题","（ ）不是成本估算的方法",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","估算法",false,{"key":16,"text":17,"correct":14},"B","确定资源费率",{"key":19,"text":20,"correct":14},"C","工料清单法",{"key":22,"text":23,"correct":24},"D","挣值分析法",true,"",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]