[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384492":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},384492,165,1,"单选题","一个新软件产品的构建阶段即将完工。下一个阶段是测试和执行。这个进度计划提前了两周。在进入最后阶段之前，项目经理最应该关注（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","范围确认",true,{"key":16,"text":17,"correct":18},"B","风险控制",false,{"key":20,"text":21,"correct":18},"C","绩效报告",{"key":23,"text":24,"correct":18},"D","成本控制","本题考查的是范围确认的知识。范围确认就是阶段性的验收，根据提干意思，是选A。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]