[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384372":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},384372,165,1,"单选题","在进行项目整体变更控制过程中，首先要受理变更申请，接下来 （ ） 。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","接受或拒绝变更",false,{"key":16,"text":17,"correct":14},"B","执行变更",{"key":19,"text":20,"correct":14},"C","进行变更结果追踪与审核",{"key":22,"text":23,"correct":24},"D","进行变更的整体影响分析",true,"",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]