[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384360":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},384360,165,1,"单选题","项目建议书是项目可行性研究的依据，()一般不属于项目建议书的内容。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设备选型",true,{"key":16,"text":17,"correct":18},"B","建设背景和必需的条件",false,{"key":20,"text":21,"correct":18},"C","市场规模预测",{"key":23,"text":24,"correct":18},"D","产品方案","设备选型比较具体，不属于项目建议书的内容。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]