[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384353":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},384353,165,1,"单选题","某单位为加强项目管理，计划在 2013 年建设一个项目管理系统，但企业领导对该系统没有提出具体要求。 如果钱工对比了自主开发和外购的成本、时间差异，该行为属于 （ ） 。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目的财务评价",true,{"key":16,"text":17,"correct":18},"B","项目的总量评估",false,{"key":20,"text":21,"correct":18},"C","项目的技术方案评估",{"key":23,"text":24,"correct":18},"D","项目的国民经济评价","",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]