[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384348":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},384348,165,1,"单选题","项目详细可行性分析有一种方法，将有项目时的成本（效益）与无项目时的成本（效益）进行比较，求得两者差额。这种分析方法称之为（） 。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","经济评价法",false,{"key":16,"text":17,"correct":14},"B","市场预测法",{"key":19,"text":20,"correct":14},"C","投资估算法",{"key":22,"text":23,"correct":24},"D","有无比较法",true,"项目详细可行性分析有一种方法，将有项目时的成本（效益）与无项目时的成本（效益）进行比较，求得两者差额。这种分析方法称之为增量净效益法（有无比较法）。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]