[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384341":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},384341,165,1,"单选题","项目承建方的项目论证需要从五个方面展开，其中不包括 （ ） 。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","承建方技术可行性分析",false,{"key":16,"text":17,"correct":14},"B","承建方人力及其他资源配置能力可行性分析",{"key":19,"text":20,"correct":21},"C","承建方综合能力分析",true,{"key":23,"text":24,"correct":14},"D","项目财务可行性分析和项目风险分析","项目承建方的项目论证包括：承建方技术可行性分析。承建方人力及其他资源配置能力可行性分析。项目财务可行性分析。项目风险分析。对可能的其他投标者的相关情况分析。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]