[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384330":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},384330,165,1,"单选题","以下不属于项目可行性研究内容的是 （ ） 。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目的详细管理计划",true,{"key":16,"text":17,"correct":18},"B","项目的风险因素及其对策",false,{"key":20,"text":21,"correct":18},"C","项目的社会影响性分析",{"key":23,"text":24,"correct":18},"D","项目的财务盈利能力评价","",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]