[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384315":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},384315,165,1,"单选题","作为系统集成企业售前负责人，在说服本单位领导批准参加项目投标时，不需介绍 （ ） 。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","本企业技术可行性分析",false,{"key":16,"text":17,"correct":14},"B","企业人员能力和配置分析",{"key":19,"text":20,"correct":21},"C","项目的国民经济分析",true,{"key":23,"text":24,"correct":14},"D","项目财务可行性分析","",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]