[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384249":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},384249,165,1,"单选题","李先生是某软件开发公司负责项目的项目经理，该项目已经完成了前期的工作进入了实现阶段，但用户提出要增加一项新的功能，李先生应该（ ）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","拒绝该变更",false,{"key":16,"text":17,"correct":14},"B","认为用户要求合理、立即实现该变更",{"key":19,"text":20,"correct":21},"C","通过变更控制过程管理该变更",true,{"key":23,"text":24,"correct":14},"D","要求用户与公司领导协调","所有变更应遵循变更控制过程管理流程。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]