[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384241":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},384241,165,1,"单选题","变更管理的工作程序包括：接受变更申请、对变更的初审、（ ）、CCB决定是否批准、发出变更通知并开始实施、变更实施监控、变更效果评估",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","A. 变更实施",false,{"key":16,"text":17,"correct":18},"B","变更方案论证",true,{"key":20,"text":21,"correct":14},"C","组建CC",{"key":23,"text":24,"correct":14},"D","判断发生变更的项目是否己纳入正常轨道","（1）提出与接受变更申请。（2）对变更的初审。（3）变更方案论证。（4）CCB审查。（5）发出变更通知并开始实施。（6）变更实施的监控。（7）变更效果评估。（8）判断发生变更的项目是否己纳入正常轨道。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]