[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384199":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},384199,165,1,"单选题","以下不能用于成本补偿合同的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","需立即开展工作的项目",false,{"key":16,"text":17,"correct":14},"B","对项目内容及技术经济指标未确定的项目",{"key":19,"text":20,"correct":14},"C","风险大的项目",{"key":22,"text":23,"correct":24},"D","工程量不太大且能精确计算、工期较短、技术不太复杂、风险不大的项目",true,"本题考查成本补偿合同的适用范围。 成本补偿合同主要用于： （1）需立即开展工作的项目 （2）对项目内容及技术经济指标未确定的项目 （3）风险大的项目",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]