[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384165":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},384165,165,1,"单选题","下列不属于控制沟通输出中变更请求的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","新的或者更新的成本估算、活动排序、进度、资源需求和风险应对方案",false,{"key":16,"text":17,"correct":18},"B","调整项目管理计划",true,{"key":20,"text":21,"correct":14},"C","纠正措施",{"key":23,"text":24,"correct":14},"D","预防措施","本题考查变更请求的内容。 变更请求包括： （1）新的或者更新的成本估算、活动排序、进度、资源需求和风险应对方案 （2）调整项目管理计划和文档 （3）纠正措施 （4）预防措施",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]