[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384120":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},384120,165,1,"单选题","（ ）是编制质量规划的首要工作。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","需找影响质量的因素",false,{"key":16,"text":17,"correct":14},"B","研究项目产品说明书",{"key":19,"text":20,"correct":14},"C","确定质量度量指标",{"key":22,"text":23,"correct":24},"D","识别相关质量标准",true,"质量计划编制包括识别与该项目相关的质量标准以及确定如何满足这些标准。这样质量计划编制首先由识别相关的质量标准开始，通过参照或者依据实施项目组织的质量策略、项目的范围说明书、产品说明书等作为质量计划编制的依据，识别出项目相关的所有质量标准而达到或者超过项目的客户以及其他项目干系人的期望和要求。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]