[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-382353":3},{"question":4,"library":24},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":23},382353,164,1,"单选题","下图是一个软件项目的活动图，其中顶点表示项目里程碑，连接顶点的边表示活动，边的权重表示活动的持续时间，则里程碑( 本题 )在关键路径上。活动GH的松弛时间是（下题）。",[11,15,18,20],{"key":12,"text":13,"correct":14},"A","B",true,{"key":13,"text":16,"correct":17},"E",false,{"key":19,"text":19,"correct":17},"C",{"key":21,"text":22,"correct":17},"D","K","",{"id":6,"name":25,"category":26,"favorite":27},"(中级) 网络工程师","职业资格",0]