[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-163-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":617},{"id":5,"name":6,"category":7,"favorite":8},163,"(中级) 数据库系统工程师","职业资格",0,6,50,450,[13,31,43,55,67,79,91,103,115,127,139,151,163,175,187,199,211,223,235,247,259,271,283,295,307,319,331,343,355,367,379,390,402,414,426,438,450,462,473,485,497,509,521,533,545,557,569,581,593,605],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":23,"analysis":30},382027,1,"单选题","某项目包含的活动如下表所示，完成整个项目的最短时间为（ ）周。不能通过缩短活动（请作答此空）的工期，来缩短整个项目的完成时间。",[19,22,25,28],{"key":20,"text":20,"correct":21},"A",false,{"key":23,"text":23,"correct":24},"B",true,{"key":26,"text":27,"correct":21},"C","D",{"key":27,"text":29,"correct":21},"F","",{"id":32,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":34,"answer":27,"analysis":30},382028,"以下关于进度管理工具图的叙述中，不正确的是（ ）。",[35,37,39,41],{"key":20,"text":36,"correct":21},"能清晰地表达每个任务的开始时间、结束时间和持续时间",{"key":23,"text":38,"correct":21},"能清晰地表达任务之间的并行关系",{"key":26,"text":40,"correct":21},"不能清晰地确定任务之间的依赖关系",{"key":27,"text":42,"correct":24},"能清晰地确定影响进度的关键任务",{"id":44,"libraryId":5,"type":15,"typeLabel":16,"stem":45,"options":46,"answer":27,"analysis":30},382029,"某软件项目的活动图如下图所示，其中顶点表示项目里程碑，连接顶点的边表示包含的活动，边上的数字表示活动的持续时间（天），活动BD和HK最早可以从第（ ）天开始。（活动A B、AE和AC最早从第1天开始）",[47,49,51,53],{"key":20,"text":48,"correct":21},"17",{"key":23,"text":50,"correct":21},"18",{"key":26,"text":52,"correct":21},"19",{"key":27,"text":54,"correct":24},"20",{"id":56,"libraryId":5,"type":15,"typeLabel":16,"stem":57,"options":58,"answer":26,"analysis":30},382030,"安全需求可划分为物理线路安全、网络安全、系统安全和应用安全。下面的安全需求中属于系统安全的是（请作答此空），属于应用安全的是（ ）。",[59,61,63,65],{"key":20,"text":60,"correct":21},"机房安全",{"key":23,"text":62,"correct":21},"入侵检测",{"key":26,"text":64,"correct":24},"漏洞补丁管理",{"key":27,"text":66,"correct":21},"数据库安全",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":20,"analysis":30},382031,"项目复杂性、规模和结构的不确定性属于（ ）风险。",[71,73,75,77],{"key":20,"text":72,"correct":24},"项目",{"key":23,"text":74,"correct":21},"技术",{"key":26,"text":76,"correct":21},"经济",{"key":27,"text":78,"correct":21},"商业",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":20,"analysis":30},382032,"在（ ）设计阶段选择适当的解决方案，将系统分解为若干个子系统，建立整个系统的体系结构。",[83,85,87,89],{"key":20,"text":84,"correct":24},"概要",{"key":23,"text":86,"correct":21},"详细",{"key":26,"text":88,"correct":21},"结构化",{"key":27,"text":90,"correct":21},"面向对象",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":27,"analysis":30},382033,"以下关于结构化开发方法的叙述中，不正确的是（ ）。",[95,97,99,101],{"key":20,"text":96,"correct":21},"将数据流映射为软件系统的模块结构",{"key":23,"text":98,"correct":21},"一般情况下，数据流类型包括变换流型和事务流型",{"key":26,"text":100,"correct":21},"不同类型的数据流有不同的映射方法",{"key":27,"text":102,"correct":24},"一个软件系统只有一种数据流类型",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":23,"analysis":30},382034,"在结构化分析中，用数据流图描述（请作答此空）。当采用数据流图对一个图书馆管理系统进行分析时，（ ）是一个外部实体。",[107,109,111,113],{"key":20,"text":108,"correct":21},"数据对象之间的关系，用于对数据建模",{"key":23,"text":110,"correct":24},"数据在系统中如何被传送或变换，以及如何对数据流进行变换的功能或子功能，用于对功能建模",{"key":26,"text":112,"correct":21},"系统对外部事件如何响应，如何动作，用于对行为建模",{"key":27,"text":114,"correct":21},"数据流图中的各个组成部分",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":26,"analysis":30},382035,"模块A提供某个班级某门课程的成绩给模块 B，模块B计算平均成绩、最高分和最低分，将计算结果返回给模块 A，则模块B在软件结构图中属于（ ）模块。",[119,121,123,125],{"key":20,"text":120,"correct":21},"传入",{"key":23,"text":122,"correct":21},"传出",{"key":26,"text":124,"correct":24},"变换",{"key":27,"text":126,"correct":21},"协调",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":27,"analysis":30},382036,"在下列机制中，（请作答此空）是指过程调用和响应调用所需执行的代码在运行时加以结合；而（ ）是过程调用和响应调用所需执行的代码在编译时加以结合。",[131,133,135,137],{"key":20,"text":132,"correct":21},"消息传递",{"key":23,"text":134,"correct":21},"类型检查",{"key":26,"text":136,"correct":21},"静态绑定",{"key":27,"text":138,"correct":24},"动态绑定",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":26,"analysis":30},382037,"风险的优先级通常是根据（ ）设定。",[143,145,147,149],{"key":20,"text":144,"correct":21},"风险影响（Risk Impact）",{"key":23,"text":146,"correct":21},"风险概率（Risk Probability）",{"key":26,"text":148,"correct":24},"风险暴露（Risk Exposure）",{"key":27,"text":150,"correct":21},"风险控制（Risk Control）",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":27,"analysis":30},382038,"甲、乙两人在同一时间就同样的发明创造提交了专利申请，专利局将分别向各申请人通报有关情况，并提出多种解决这一问题的办法，不可能采用（ ）的办法。",[155,157,159,161],{"key":20,"text":156,"correct":21},"两申请人作为一件申请的共同申请人",{"key":23,"text":158,"correct":21},"其中一方放弃权利并从另一方得到适当的补偿",{"key":26,"text":160,"correct":21},"两件申请都不授予专利权",{"key":27,"text":162,"correct":24},"两件申请都授予专利权",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":20,"analysis":30},382039,"某软件公司参与开发管理系统软件的程序员张某，辞职到另一公司任职，于是该项目负责人将该管理系统软件上开发者的署名更改为李某（接张某工作）。该项目负责人的行为（ ）。",[167,169,171,173],{"key":20,"text":168,"correct":24},"侵犯了张某开发者身份权（署名权）",{"key":23,"text":170,"correct":21},"不构成侵权，因为程序员张某不是软件著作权人",{"key":26,"text":172,"correct":21},"只是行使管理者的权利，不构成侵权",{"key":27,"text":174,"correct":21},"不构成侵权，因为程序员张某现已不是项目组成员",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":20,"analysis":30},382040,"王某是某公司的软件设计师，每当软件开发完成后均按公司规定编写软件文档，并提交公司存档。那么该软件文档的著作权（ ）享有。",[179,181,183,185],{"key":20,"text":180,"correct":24},"应由公司",{"key":23,"text":182,"correct":21},"应由公司和王某共同",{"key":26,"text":184,"correct":21},"应由王某",{"key":27,"text":186,"correct":21},"除署名权以外，著作权的其他权利由王某",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":27,"analysis":30},382041,"甲、乙两人在同一天就同样的发明创造提交了专利申请专利局将分别向各申请人通报有关情况，并提出多种可能采用的解决办法。下列说法中，不可能采用（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":21},"甲、乙作为共同申请人",{"key":23,"text":194,"correct":21},"甲或乙一方放弃权利并从另一方得到适当的补偿",{"key":26,"text":196,"correct":21},"甲、乙都不授予专利权",{"key":27,"text":198,"correct":24},"甲、乙都授予专利权",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":20,"analysis":30},382042,"以下关于计算机软件著作权的叙述中，正确的是（ ）",[203,205,207,209],{"key":20,"text":204,"correct":24},"非法进行拷贝、发布或更改软件的人被称为软件盗版者",{"key":23,"text":206,"correct":21},"《计算机软件保护条例》是国家知识产权局颁布的，用来保护软件著作权人的权益",{"key":26,"text":208,"correct":21},"软件著作权属于软件开发者，软件著作权自软件开发完成之日起产生",{"key":27,"text":210,"correct":21},"用户购买了具有版权的软件，则具有对该软件的使用权和复制权",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":23,"analysis":30},382043,"王某是某公司的软件设计师，完成某项软件开发后按公司规定进行软件归档，以下关于该软件的著作权的叙述中，正确的是（ ）",[215,217,219,221],{"key":20,"text":216,"correct":21},"著作权应由公司和王某共同享有",{"key":23,"text":218,"correct":24},"著作权应由公司享有",{"key":26,"text":220,"correct":21},"著作权应由王某享有",{"key":27,"text":222,"correct":21},"除署名权以外，著作权的其他权利由王某享有",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":27,"analysis":30},382044,"根据我国商标法，下列商品中必须使用注册商标的是（ ）。",[227,229,231,233],{"key":20,"text":228,"correct":21},"医疗仪器",{"key":23,"text":230,"correct":21},"墙壁涂料",{"key":26,"text":232,"correct":21},"无糖食品",{"key":27,"text":234,"correct":24},"烟草制品",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":27,"analysis":30},382045,"知识产权一般都具有法定的保护期限，一旦保护期限届满，权利将自行终止，成为社会公众可以自由使用的知识。_（ ）_权受法律保护的期限是不确定的，一旦为公众所知悉，即成为公众可以自由使用的知识。",[239,241,243,245],{"key":20,"text":240,"correct":21},"发明专利",{"key":23,"text":242,"correct":21},"商标",{"key":26,"text":244,"correct":21},"作品发表",{"key":27,"text":246,"correct":24},"商业秘密",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":20,"analysis":30},382046,"《计算机软件产品开发文件编制指南》》（GB 8567-88）是（ ）标准。",[251,253,255,257],{"key":20,"text":252,"correct":24},"强制性国家",{"key":23,"text":254,"correct":21},"推荐性国家",{"key":26,"text":256,"correct":21},"强制性行业",{"key":27,"text":258,"correct":21},"推荐性行业",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":26,"analysis":30},382047,"甲、乙两软件公司于2012年7月12日就其财务软件产品分别申请“用友”和“用有”商标注册。两财务软件相似，甲第一次使用时间为2009年7月，乙第一次使用时间为2009年5月。此情形下，（ ）能获准注册。",[263,265,267,269],{"key":20,"text":264,"correct":21},"“用友”",{"key":23,"text":266,"correct":21},"“用友”与“用有”都",{"key":26,"text":268,"correct":24},"“用有”",{"key":27,"text":270,"correct":21},"由甲、乙抽签结果确定",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":27,"analysis":30},382048,"美国某公司与中国某企业谈技术合作，合同约定使用1项美国专利（获得批准并在有效期内），该项技术未在中国和其他国家申请专利。依照该专利生产的产品（ ）需要向美国公司支付这件美国专利的许可使用费。",[275,277,279,281],{"key":20,"text":276,"correct":21},"在中国销售，中国企业",{"key":23,"text":278,"correct":21},"如果返销美国，中国企业不",{"key":26,"text":280,"correct":21},"在其他国家销售，中国企业",{"key":27,"text":282,"correct":24},"在中国销售，中国企业不",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":20,"analysis":30},382049,"甲软件公司受乙企业委托安排公司软件设计师开发了信息系统管理软件，由于在委托开发合同中未对软件著作权归属作出明确的约定，所以该信息系统管理软件的著作权由（ ）享有。",[287,289,291,293],{"key":20,"text":288,"correct":24},"甲",{"key":23,"text":290,"correct":21},"乙",{"key":26,"text":292,"correct":21},"甲与乙共同",{"key":27,"text":294,"correct":21},"软件设计师",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":27,"analysis":30},382050,"王某买了一幅美术作品原件，则他享有该美术作品的（ ）。",[299,301,303,305],{"key":20,"text":300,"correct":21},"著作权",{"key":23,"text":302,"correct":21},"所有权",{"key":26,"text":304,"correct":21},"展览权",{"key":27,"text":306,"correct":24},"所有权与其展览权",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":27,"analysis":30},382051,"甲、乙两公司的软件设计师分别完成了相同的计算机程序发明，甲公司先于乙公司完成，乙公司先于甲公司使用。甲、乙公司于同一天向专利局申请发明专利。此情形下，（ ）可获得专利权。",[311,313,315,317],{"key":20,"text":312,"correct":21},"甲公司",{"key":23,"text":314,"correct":21},"甲、乙公司均",{"key":26,"text":316,"correct":21},"乙公司",{"key":27,"text":318,"correct":24},"由甲、乙公司协商确定谁",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":23,"analysis":30},382052,"A transaction is an action,or a series of actions,carried out by a single user or（ ）,that accesses or changes the contents of the database.A transaction should possess the four basic or so-called ACID properties:Atomicity.The“all or nothing”property.A transaction is an（ ）unit that is either performed in its entirety or is not performed at all.Consistency.A transaction must transform the database from one consistent state to another consistent state.Isolation.Transactions execute independently of one another.In other words,the partial effects of（ ）transactions should not be visible to other transactions.Durability.The effects of a successfully completed（committed）transaction are permanently recorded in the database and must not be lost because of a subsequent failure.The four properties above,only（请作答此空）property is the responsibility of the concurrency control subsystem to ensure.It is the responsibility of both the（ ）and the application developers to ensure consistency.To guarantee the Atomicity and Durability properties after a failure,a log file is needed.",[323,325,327,329],{"key":20,"text":324,"correct":21},"atomicity",{"key":23,"text":326,"correct":24},"consistency",{"key":26,"text":328,"correct":21},"isolation",{"key":27,"text":330,"correct":21},"durability",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":26,"analysis":30},382053,"So it is today.Schedule disaster,functional misfits,and system bugs all arise because the left hand doesn't know what the right hand is doing.As work（ ）,the several teams slowly change the functions,sizes,and speeds of their own programs,and they explicitly or implicitly（ ）their assumptions about the inputs available and the uses to be made of the outputs.For example,the implementer of a program-overlaying function may run into problems and reduce speed relying on statistics that show how（ ）this function will arise in application programs.Meanwhile,back at the ranch,his neighbor may be designing a major part of the supervisor so that it critically depends upon the speed of this function.This change in speed itself becomes a major specification change,and it needs to be proclaimed abroad and weighed from a system point of view.How,then,shall teams（请作答此空）with one another?In as many ways as possible.Informally.Good telephone service and a clear definition of intergroup dependencies will encourage the hundreds of calls upon which common interpretation of written documents depends.Meetings.Regular project meetings,with one team after another giving technical riefings,are（ ）.Hundreds of minor misunderstandings get smoked out this way.Workbook.A formal project workbook must be started at the beginning.",[335,337,339,341],{"key":20,"text":336,"correct":21},"work",{"key":23,"text":338,"correct":21},"program",{"key":26,"text":340,"correct":24},"communicate",{"key":27,"text":342,"correct":21},"talk",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":23,"analysis":30},382054,"A transaction is an action,or a series of actions,carried out by a single user or（ ）,that accesses or changes the contents of the database.A transaction should possess the four basic or so-called ACID properties:Atomicity.The“all or nothing”property.A transaction is an（ ）unit that is either performed in its entirety or is not performed at all.Consistency.A transaction must transform the database from one consistent state to another consistent state.Isolation.Transactions execute independently of one another.In other words,the partial effects of（请作答此空）transactions should not be visible to other transactions.Durability.The effects of a successfully completed（committed）transaction are permanently recorded in the database and must not be lost because of a subsequent failure.The four properties above,only（ ）property is the responsibility of the concurrency control subsystem to ensure.It is the responsibility of both the（ ）and the application developers to ensure consistency.To guarantee the Atomicity and Durability properties after a failure,a log file is needed.",[347,349,351,353],{"key":20,"text":348,"correct":21},"completed",{"key":23,"text":350,"correct":24},"incomplete",{"key":26,"text":352,"correct":21},"aborted",{"key":27,"text":354,"correct":21},"committed",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":20,"analysis":30},382055,"A transaction is an action,or a series of actions,carried out by a single user or（ ）,that accesses or changes the contents of the database.A transaction should possess the four basic or so-called ACID properties:Atomicity.The“all or nothing”property.A transaction is an（请作答此空）unit that is either performed in its entirety or is not performed at all.Consistency.A transaction must transform the database from one consistent state to another consistent state.Isolation.Transactions execute independently of one another.In other words,the partial effects of（ ）transactions should not be visible to other transactions.Durability.The effects of a successfully completed（committed）transaction are permanently recorded in the database and must not be lost because of a subsequent failure.The four properties above,only（ ）property is the responsibility of the concurrency control subsystem to ensure.It is the responsibility of both the（ ）and the application developers to ensure consistency.To guarantee the Atomicity and Durability properties after a failure,a log file is needed.",[359,361,363,365],{"key":20,"text":360,"correct":24},"Indivisible",{"key":23,"text":362,"correct":21},"permanent",{"key":26,"text":364,"correct":21},"infrequent",{"key":27,"text":366,"correct":21},"infinite",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":20,"analysis":30},382056,"A transaction is an action,or a series of actions,carried out by a single user or（ ）,that accesses or changes the contents of the database.A transaction should possess the four basic or so-called ACID properties:Atomicity.The“all or nothing”property.A transaction is an（ ）unit that is either performed in its entirety or is not performed at all.Consistency.A transaction must transform the database from one consistent state to another consistent state.Isolation.Transactions execute independently of one another.In other words,the partial effects of（ ）transactions should not be visible to other transactions.Durability.The effects of a successfully completed（committed）transaction are permanently recorded in the database and must not be lost because of a subsequent failure.The four properties above,only（ ）property is the responsibility of the concurrency control subsystem to ensure.It is the responsibility of both the（请作答此空）and the application developers to ensure consistency.To guarantee the Atomicity and Durability properties after a failure,a log file is needed.",[371,373,375,377],{"key":20,"text":372,"correct":24},"DBMS",{"key":23,"text":374,"correct":21},"DBA",{"key":26,"text":376,"correct":21},"end user",{"key":27,"text":378,"correct":21},"DBS",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":26,"analysis":30},382057,"A transaction is an action,or a series of actions,carried out by a single user or（请作答此空）,that accesses or changes the contents of the database.A transaction should possess the four basic or so-called ACID properties:Atomicity.The“all or nothing”property.A transaction is an（ ）unit that is either performed in its entirety or is not performed at all.Consistency.A transaction must transform the database from one consistent state to another consistent state.Isolation.Transactions execute independently of one another.In other words,the partial effects of（ ）transactions should not be visible to other transactions.Durability.The effects of a successfully completed（committed）transaction are permanently recorded in the database and must not be lost because of a subsequent failure.The four properties above,only（ ）property is the responsibility of the concurrency control subsystem to ensure.It is the responsibility of both the（ ）and the application developers to ensure consistency.To guarantee the Atomicity and Durability properties after a failure,a log file is needed.",[383,385,387,389],{"key":20,"text":384,"correct":21},"application developer",{"key":23,"text":386,"correct":21},"all users",{"key":26,"text":388,"correct":24},"application program",{"key":27,"text":372,"correct":21},{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":27,"analysis":30},382058,"So it is today.Schedule disaster,functional misfits,and system bugs all arise because the left hand doesn't know what the right hand is doing.As work（ ）,the several teams slowly change the functions,sizes,and speeds of their own programs,and they explicitly or implicitly（ ）their assumptions about the inputs available and the uses to be made of the outputs.For example,the implementer of a program-overlaying function may run into problems and reduce speed relying on statistics that show how（ ）this function will arise in application programs.Meanwhile,back at the ranch,his neighbor may be designing a major part of the supervisor so that it critically depends upon the speed of this function.This change in speed itself becomes a major specification change,and it needs to be proclaimed abroad and weighed from a system point of view.How,then,shall teams（ ）with one another?In as many ways as possible.Informally.Good telephone service and a clear definition of intergroup dependencies will encourage the hundreds of calls upon which common interpretation of written documents depends.Meetings.Regular project meetings,with one team after another giving technical riefings,are（请作答此空）.Hundreds of minor misunderstandings get smoked out this way.Workbook.A formal project workbook must be started at the beginning.",[394,396,398,400],{"key":20,"text":395,"correct":21},"worthless",{"key":23,"text":397,"correct":21},"valueless",{"key":26,"text":399,"correct":21},"useless",{"key":27,"text":401,"correct":24},"invaluable",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":20,"analysis":30},382059,"The purpose of the requirements definition phase is to produce a clear,complete,consistent,and testable（ ）of the technical requirements for the software product.During the requirements definition phase,the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform and each（ ）that it must meet.The starting point is usually a set of high level requirements from the（ ）that describe the project or problem.In either case,the requirements definition team formulates an overall concept for the system and then defines（ ）showing how the system will be operated publishes the system and operations concept document and conducts a system concept review（SCR）.Following the SCR,the team derives（请作答此空）requirements for the system from the high level requirements and the system and operations concept.using structured or object-oriented analysis.the team specifies the software functions and algorithms needed to satisfy each detailed requirement.",[406,408,410,412],{"key":20,"text":407,"correct":24},"detailed",{"key":23,"text":409,"correct":21},"outlined",{"key":26,"text":411,"correct":21},"total",{"key":27,"text":413,"correct":21},"complete",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":20,"analysis":30},382060,"Networks can be interconnected by different devices in the physical layer networks can be connected by（ ）_or hubs.which just move the bits from one network to an identical network.One layer up we find bridges and switches which operate at data link layer.They can accept（请作答此空）examine the MAC address and forward the frames to a different network while doing minor protocol translation in the process in me network layer,we have routers that can connect two networks,If two networks have（ ）network layer,the router may be able to translate between the packer formats.In the transport layer we find transport gateway,which can interface between two transport connections Finally,in the application layer,application gateways translate message（ ）.As an example,gateways between Internet e-mail and X.400 e-mail must（ ）the e-mail message and change various header fields.",[418,420,422,424],{"key":20,"text":419,"correct":24},"frimes",{"key":23,"text":421,"correct":21},"packets",{"key":26,"text":423,"correct":21},"packages",{"key":27,"text":425,"correct":21},"cells",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":20,"analysis":30},382061,"So it is today.Schedule disaster,functional misfits,and system bugs all arise because the left hand doesn't know what the right hand is doing.As work（ ）,the several teams slowly change the functions,sizes,and speeds of their own programs,and they explicitly or implicitly（请作答此空）their assumptions about the inputs available and the uses to be made of the outputs.For example,the implementer of a program-overlaying function may run into problems and reduce speed relying on statistics that show how（ ）this function will arise in application programs.Meanwhile,back at the ranch,his neighbor may be designing a major part of the supervisor so that it critically depends upon the speed of this function.This change in speed itself becomes a major specification change,and it needs to be proclaimed abroad and weighed from a system point of view.How,then,shall teams（ ）with one another?In as many ways as possible.Informally.Good telephone service and a clear definition of intergroup dependencies will encourage the hundreds of calls upon which common interpretation of written documents depends.Meetings.Regular project meetings,with one team after another giving technical riefings,are（ ）.Hundreds of minor misunderstandings get smoked out this way.Workbook.A formal project workbook must be started at the beginning.",[430,432,434,436],{"key":20,"text":431,"correct":24},"change",{"key":23,"text":433,"correct":21},"proceed",{"key":26,"text":435,"correct":21},"smooth",{"key":27,"text":437,"correct":21},"hide",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":23,"analysis":30},382062,"The purpose of the requirements definition phase is to produce a clear,complete,consistent,and testable（ ）of the technical requirements for the software product.During the requirements definition phase,the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform and each（ ）that it must meet.The starting point is usually a set of high level requirements from the（请作答此空）that describe the project or problem.In either case,the requirements definition team formulates an overall concept for the system and then defines（ ）showing how the system will be operated publishes the system and operations concept document and conducts a system concept review（SCR）.Following the SCR,the team derives（ ）requirements for the system from the high level requirements and the system and operations concept.using structured or object-oriented analysis.the team specifies the software functions and algorithms needed to satisfy each detailed requirement.",[442,444,446,448],{"key":20,"text":443,"correct":21},"producer",{"key":23,"text":445,"correct":24},"customer",{"key":26,"text":447,"correct":21},"programmer",{"key":27,"text":449,"correct":21},"analyser",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":26,"analysis":30},382063,"The purpose of the requirements definition phase is to produce a clear,complete,consistent,and testable（请作答此空）of the technical requirements for the software product.During the requirements definition phase,the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform and each（ ）that it must meet.The starting point is usually a set of high level requirements from the（ ）that describe the project or problem.In either case,the requirements definition team formulates an overall concept for the system and then defines（ ）showing how the system will be operated publishes the system and operations concept document and conducts a system concept review（SCR）.Following the SCR,the team derives（ ）requirements for the system from the high level requirements and the system and operations concept.using structured or object-oriented analysis.the team specifies the software functions and algorithms needed to satisfy each detailed requirement.",[454,456,458,460],{"key":20,"text":455,"correct":21},"function",{"key":23,"text":457,"correct":21},"definition",{"key":26,"text":459,"correct":24},"specification",{"key":27,"text":461,"correct":21},"statement",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":20,"analysis":30},382064,"Networks can be interconnected by different devices in the physical layer networks can be connected by（请作答此空）_or hubs.which just move the bits from one network to an identical network.One layer up we find bridges and switches which operate at data link layer.They can accept（ ）examine the MAC address and forward the frames to a different network while doing minor protocol translation in the process in me network layer,we have routers that can connect two networks,If two networks have（ ）network layer,the router may be able to translate between the packer formats.In the transport layer we find transport gateway,which can interface between two transport connections Finally,in the application layer,application gateways translate message（ ）.As an example,gateways between Internet e-mail and X.400 e-mail must（ ）the e-mail message and change various header fields.",[466,468,470,471],{"key":20,"text":467,"correct":24},"reapers",{"key":23,"text":469,"correct":21},"relays",{"key":26,"text":423,"correct":21},{"key":27,"text":472,"correct":21},"modems",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":27,"analysis":30},382065,"Networks can be interconnected by different devices in the physical layer networks can be connected by（ ）or hubs.which just move the bits from one network to an identical network.One layer up we find bridges and switches which operate at data link layer.They can accept（ ）examine the MAC address and forward the frames to a different network while doing minor protocol translation in the process in me network layer,we have routers that can connect two networks,If two networks have（请作答此空）network layer,the router may be able to translate between the packer formats.In the transport layer we find transport gateway,which can interface between two transport connections Finally,in the application layer,application gateways translate message（ ）.As an example,gateways between Internet e-mail and X.400 e-mail must（ ）the e-mail message and change various header fields.",[477,479,481,483],{"key":20,"text":478,"correct":21},"special",{"key":23,"text":480,"correct":21},"dependent",{"key":26,"text":482,"correct":21},"similar",{"key":27,"text":484,"correct":24},"dissimilar",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":20,"analysis":30},382066,"The purpose of the requirements definition phase is to produce a clear,complete,consistent,and testable（ ）of the technical requirements for the software product.During the requirements definition phase,the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform and each（请作答此空）that it must meet.The starting point is usually a set of high level requirements from the（ ）that describe the project or problem.In either case,the requirements definition team formulates an overall concept for the system and then defines（ ）showing how the system will be operated publishes the system and operations concept document and conducts a system concept review（SCR）.Following the SCR,the team derives（ ）requirements for the system from the high level requirements and the system and operations concept.using structured or object-oriented analysis.the team specifies the software functions and algorithms needed to satisfy each detailed requirement.",[489,491,493,495],{"key":20,"text":490,"correct":24},"criterion",{"key":23,"text":492,"correct":21},"standard",{"key":26,"text":494,"correct":21},"model",{"key":27,"text":496,"correct":21},"system",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":26,"analysis":30},382067,"The purpose of the requirements definition phase is to produce a clear,complete,consistent,and testable（ ）of the technical requirements for the software product.During the requirements definition phase,the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform and each（ ）that it must meet.The starting point is usually a set of high level requirements from the（ ）that describe the project or problem.In either case,the requirements definition team formulatesan overall concept for the system and then defines（请作答此空）showing how the system will be operated publishes the system and operations concept document and conducts a system concept review（SCR）.Following the SCR,the team derives（ ）requirements for the system from the high level requirements and the system and operations concept.using structured or object-oriented analysis.the team specifies the software functions and algorithms needed to satisfy each detailed requirement.",[501,503,505,507],{"key":20,"text":502,"correct":21},"rules",{"key":23,"text":504,"correct":21},"principles",{"key":26,"text":506,"correct":24},"scenarios",{"key":27,"text":508,"correct":21},"scenes",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":23,"analysis":30},382068,"Networks can be interconnected by different devices in the physical layer networks can be connected by（ ）or hubs.which just move the bits from one network to an identical network.One layer up we find bridges and switches which operate at data link layer.They can accept（ ）examine the MAC address and forward the frames to a different network while doing minor protocol translation in the process in me network layer,we have routers that can connect two networks,If two networks have（ ）network layer,the router may be able to translate between the packer formats.In the transport layer we find transport gateway,which can interface between two transport connections Finally,in the application layer,application gateways translate message（ ）.As an example,gateways between Internet e-mail and X.400 e-mail must（请作答此空）the e-mail message and change various header fields.",[513,515,517,519],{"key":20,"text":514,"correct":21},"analyze",{"key":23,"text":516,"correct":24},"parse",{"key":26,"text":518,"correct":21},"delete",{"key":27,"text":520,"correct":21},"create",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":23,"analysis":30},382069,"So it is today.Schedule disaster,functional misfits,and system bugs all arise because the left hand doesn't know what the right hand is doing.As work（请作答此空）,the several teams slowly change the functions,sizes,and speeds of their own programs,and they explicitly or implicitly（ ）their assumptions about the inputs available and the uses to be made of the outputs.For example,the implementer of a program-overlaying function may run into problems and reduce speed relying on statistics that show how（ ）this function will arise in application programs.Meanwhile,back at the ranch,his neighbor may be designing a major part of the supervisor so that it critically depends upon the speed of this function.This change in speed itself becomes a major specification change,and it needs to be proclaimed abroad and weighed from a system point of view.How,then,shall teams（ ）with one another?In as many ways as possible.Informally.Good telephone service and a clear definition of intergroup dependencies will encourage the hundreds of calls upon which common interpretation of written documents depends.Meetings.Regular project meetings,with one team after another giving technical riefings,are（ ）.Hundreds of minor misunderstandings get smoked out this way.Workbook.A formal project workbook must be started at the beginning.",[525,527,529,531],{"key":20,"text":526,"correct":21},"starts",{"key":23,"text":528,"correct":24},"proceeds",{"key":26,"text":530,"correct":21},"stops",{"key":27,"text":532,"correct":21},"speeds",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":27,"analysis":30},382070,"So it is today.Schedule disaster,functional misfits,and system bugs all arise because the left hand doesn't know what the right hand is doing.As work（ ）,the several teams slowly change the functions,sizes,and speeds of their own programs,and they explicitly or implicitly（ ）their assumptions about the inputs available and the uses to be made of the outputs.For example,the implementer of a program-overlaying function may run into problems and reduce speed relying on statistics that show how（请作答此空）this function will arise in application programs.Meanwhile,back at the ranch,his neighbor may be designing a major part of the supervisor so that it critically depends upon the speed of this function.This change in speed itself becomes a major specification change,and it needs to be proclaimed abroad and weighed from a system point of view.How,then,shall teams（ ）with one another?In as many ways as possible.Informally.Good telephone service and a clear definition of intergroup dependencies will encourage the hundreds of calls upon which common interpretation of written documents depends.Meetings.Regular project meetings,with one team after another giving technical riefings,are（ ）.Hundreds of minor misunderstandings get smoked out this way.Workbook.A formal project workbook must be started at the beginning.",[537,539,541,543],{"key":20,"text":538,"correct":21},"frequently",{"key":23,"text":540,"correct":21},"usually",{"key":26,"text":542,"correct":21},"commonly",{"key":27,"text":544,"correct":24},"rarely",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":23,"analysis":30},382071,"Networks can be interconnected by different devices in the physical layer networks can be connected by（ ）_or hubs.which just move the bits from one network to an identical network.One layer up we find bridges and switches which operate at data link layer.They can accept（ ）examine the MAC address and forward the frames to a different network while doing minor protocol translation in the process in me network layer,we have routers that can connect two networks,If two networks have（ ）network layer,the router may be able to translate between the packer formats.In the transport layer we find transport gateway,which can interface between two transport connections Finally,in the application layer,application gateways translate message（请作答此空）.As an example,gateways between Internet e-mail and X.400 e-mail must（ ）the e-mail message and change various header fields.",[549,551,553,555],{"key":20,"text":550,"correct":21},"syntax",{"key":23,"text":552,"correct":24},"semantics",{"key":26,"text":554,"correct":21},"language",{"key":27,"text":556,"correct":21},"format",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":27,"analysis":30},382072,"假定每一车次具有唯一的始发站和终点站。如果实体“列车时刻表”属性为车次、始发站、发车时间、终点站、到达时间，该实体的主键是_（ ）_；如果实体“列车运行表”属性为车次、日期、发车时间、到达时间，该实体的主键是_（请作答此空）_。通常情况下，上述“列车时刻表”和“列车运行表”两实体型间_（ ）_联系。",[561,563,565,567],{"key":20,"text":562,"correct":21},"车次",{"key":23,"text":564,"correct":21},"始发站",{"key":26,"text":566,"correct":21},"发车时间",{"key":27,"text":568,"correct":24},"车次，日期",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":23,"analysis":30},382073,"数据流图（DF D）的作用是（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":21},"描述数据对象之间的关系",{"key":23,"text":576,"correct":24},"描述对数据的处理流程",{"key":26,"text":578,"correct":21},"说明将要出现的逻辑判定",{"key":27,"text":580,"correct":21},"指明系统对外部事件的反应",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":23,"analysis":30},382074,"需求分析阶段生成的文档中，用来描述企业中各项业务流程的是（ ）",[585,587,589,591],{"key":20,"text":586,"correct":21},"数据字典",{"key":23,"text":588,"correct":24},"数据流图",{"key":26,"text":590,"correct":21},"E－R图",{"key":27,"text":592,"correct":21},"关系图",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":20,"analysis":30},382075,"某企业的E-R图中，职工实体的属性有：职工号、姓名、性别,出生日期,电话和所在部门,其中职工号为实体标识符,电话为多值属性,离退休职工所在部门为离退办.在逻辑设计阶段.应将职工号和电话单独构造一个关系模式.该关系模式为（ ）;因为离退休职工不参与企业的绝大部分业务.应将这部分职工独立建立一个离退休职工关系模式,这种处理方式成为（请作答此空）。",[597,599,601,603],{"key":20,"text":598,"correct":24},"水平分解",{"key":23,"text":600,"correct":21},"垂直分解",{"key":26,"text":602,"correct":21},"规范化",{"key":27,"text":604,"correct":21},"逆规范化",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":23,"analysis":30},382076,"数据库概念结构设计阶段是在（ ）的基础上，依照用户需求对信息进行分类、聚集和概括，建立概念模型。",[609,611,613,615],{"key":20,"text":610,"correct":21},"逻辑设计",{"key":23,"text":612,"correct":24},"需求分析",{"key":26,"text":614,"correct":21},"物理设计",{"key":27,"text":616,"correct":21},"运行维护",[618,622,625,628,631,634],{"id":619,"name":620,"category":7,"favorite":621},136,"法律职业试卷二(客观题 )",2,{"id":623,"name":624,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":626,"name":627,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":629,"name":630,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":632,"name":633,"category":7,"favorite":8},28,"安全工程师",{"id":635,"name":636,"category":7,"favorite":8},112,"安全生产法律知识"]