[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-381412":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},381412,162,1,"单选题","在敏捷过程的开发方法中，（ ）使用了迭代的方法，其中，把每段时间（30天）一次的迭代称为一个“冲刺”，并按需求的优先级别来实现产品，多个自组织和自治的小组并行地递增实现产品",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","极限编程XP",false,{"key":16,"text":17,"correct":14},"B","水晶法",{"key":19,"text":20,"correct":21},"C","并列争球法",true,{"key":23,"text":24,"correct":14},"D","自适应软件开发","",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 软件设计师","职业资格",0]