(中级) 软件评测师
职业资格 · 共 1020 道题
题目列表
- 单选题Computers will become more advanced and they will also become easier to use.Improved speed recognition will make the operation of a computer easier.Virtual reality(虚拟现实),the technology of( )with a computer using all of the human senses,will also contribute to better human and computer( ).Other,exotic(奇异的)models of computation are being developed,including biological computing that uses living organisms,molecular computing that uses molecules with particular( ),and computing that uses DNA,the basic unit of heredity(遗传),to store data and carry out operations.These are examples of possible future computational platforms that,so far,are limited in abilities or are strictly(请作答此空).Scientists investigate them because of the physical limitations of miniaturizing circuits embedded in silicon.There are also( )related to heat generated by even the tiniest of transistors.
- 单选题Object-oriented analysis(OO A.is a semiformal specification technique for the object-oriented paradigm.Object-oriented analysis consists of three steps.The first step is( ).It determines how the various results are computed by the product and presents this information in the form of a( )and associated scenarios.The second is( ),which determines the classes and their attributes.Then determine the interrelationships and interaction among the classes.The last step is( ),which determines the actions performed by or to each class or subclass and presents this information in the form of(请作答此空).
- 单选题Teams are required for most engineering projects.Although some small hardware or software products can be developed by individuals,the scale and complexity of modem systems is such,and the demand for short schedules so great,that it is no longer( )for one person to do most engineering jobs.Systems development is a team( ),and the effectiveness of the team largely determines the(请作答此空)of the engineermg.Development teams often behave much like baseball or basketball teams.Even though they may have multiple specialties,all the members work toward( ).However,on systems maintenance and enhancement teams,the engineers often work relatively independently,much like wrestling and track teams.A team is( )just a group of people who happen to work together.Teamwork takes practice and it involves special skills.Teams require common processes;they need agreed-upon goals;and they need effective guidance and leadership.The methods for guiding and leading such teams are well known,but they are not obvious.
- 单选题There is nothing in this world constant but inconstancy.—SWIFT Project after project designs a set of algorithms and then plunges into construction of customer-deliverable software on a schedule that demands delivery of the first thing built.In most projects,the first system built is( )usable.It may be too slow,too big,awkward to use,or all three.There is no( )but to start again,smarting but smarter,and build a redesigned version in which these problems are solved.The discard and( )may be done in one lump,or it may be done piece-by-piece.But all large-system experience shows that it will be done.Where a new system concept or new technology is used,one has to build a system to throw away,for even the best planning is not so omniscient(全知的)as to get it right the first time.The management question,therefore,is not whether to build a pilot system and throw it away.You will do that.The only question is whether to plan in advance to build a(请作答此空),or to promise to deliver the throwaway to customers.Seen this way,the answer is much clearer.Delivering that throwaway to customers buys time,but it does so only at the( )of agony(极大痛苦)for the user,distraction for the builders while they do the redesign,and a bad reputation for the product that the best redesign will find hard to live down.Hence plan to throw one away;you will,anyhow.
- 单选题In a world where it seems we already have too much to do,and too many things to think about,it seems the last thing we need is something new that we have to learn.But use cases do solve a problem with requirements:with(请作答此空)declarative equirements it's hard to describle steps and sequences of events.Use cases,stated simply,allow description of sequences of events that,taken together,lead to a system doing something useful.As simple as this sounds,this is important.When confronted only with a pile of requiements,it's often( )to make sense of what the authors of the requirements really wanted the system to do.In the preceding example,use cases reduce the ambiguity of the requirements by specifying exactly when and under what conditions certain behavior occurs;as such,the sequence of the behaviors can be regarded as a requirement.Use cases are particularly well suited to capture approaches.Although this may sound simple,the fact is that( )equirement capture approaches,with their emphasis on declarative requirements and"shall"statements,completely fail to capture the( )of the system's behavior.Use cases are a simple yet powerful way to express the behavior of the system in way that all stakeholders can easily understand.But,like anything,use cases come with their own problems,and as useful as they are,they can be( ).the result is something that is as bad,if not worse,that the original problem.Therein it's important to utilize use cases effectively without creating a greater problem than the one you started with.
- 单选题Teams are required for most engineering projects.Although some small hardware or software products can be developed by individuals,the scale and complexity of modem systems is such,and the demand for short schedules so great,that it is no longer( )for one person to do most engineering jobs.Systems development is a team( ),and the effectiveness of the team largely determines the( )of the engineermg.Development teams often behave much like baseball or basketball teams.Even though they may have multiple specialties,all the members work toward(请作答此空).However,on systems maintenance and enhancement teams,the engineers often work relatively independently,much like wrestling and track teams.A team is( )just a group of people who happen to work together.Teamwork takes practice and it involves special skills.Teams require common processes;they need agreed-upon goals;and they need effective guidance and leadership.The methods for guiding and leading such teams are well known,but they are not obvious.
- 单选题D.evelopment teams often behave much like baseball or basketball teams.Even though they may have multiple specialties,all the members work toward( ).However,on systems maintenance and enhancement teams,the engineers often work relatively independently,much like wrestling and track teams. A team is( )just a group of people who happen to work together.Teamwork takes practice and it involves special skills.Teams require common processes;they need agreed-upon goals;and they need effective guidance and leadership.The methods for guiding and leading such teams are well known,but they are not obvious.
- 单选题A.team is(请作答此空)just a group of people who happen to work together.Teamwork takes practice and it involves special skills.Teams require common processes;they need agreed-upon goals;and they need effective guidance and leadership.The methods for guiding and leading such teams are well known,but they are not obvious.
- 单选题There is nothing in this world constant but inconstancy.-SWIFT Project after project designs a set of algorithms and then plunges into construction of customer-deliverable software on a schedule that demands delivery of the first thing built. In most projects,the first system built is( )usable.It may be too slow,too big,awkward to use,or all three.There is no(请作答此空)but to start again,smarting but smarter,and build a redesigned version in which these problems are solved.The discard and( )may be done in one lump,or it may be done piece-by-piece.But all large-system experience shows that it will be done.Where a new system concept or new technology is used,one has to build a system to throw away,for even the best planning is not so omniscient(全知的)as to get it right the first time. The management question,therefore,is not whether to build a pilot system and throw it away.You will do that.The only question is whether to plan in advance to build a______,or to promise to deliver the throwaway to customers.Seen this way,the answer is much clearer.Delivering that throwaway to customers buys time,but it does SO only at the( )of agony(极大痛苦)for the user,distraction for the builders while they do the redesign,and a bad reputation for the product that the best redesign will find hard to live down. Hence plan to throw one away;you will,anyhow.
- 单选题Object-oriented analysis(OO A.is a semiformal specification technique for the object-oriented paradigm.Object-oriented analysis consists of three steps.The first step is( ).It determines how the various results are computed by the product and presents this information in the form of a(请作答此空)and associated scenarios.The second is( ),which determines the classes and their attributes.Then determine the interrelationships and interaction among the classes.The last step is( ),which determines the actions performed by or to each class or subclass and presents this information in the form of( ).
- 单选题Object-oriented analysis(OO A.is a semiformal specification technique for the object-oriented paradigm.Object-oriented analysis consists of three steps.The first step is(请作答此空).It determines how the various results are computed by the product and presents this information in the form of a( )and associated scenarios.The second is( ),which determines the classes and their attributes.Then determine the interrelationships and interaction among the classes.The last step is( ),which determines the actions performed by or to each class or subclass and presents this information in the form of( ).
- 单选题There is nothing in this world constant but inconstancy.-SWIFT Project after project designs a set of algorithms and then plunges into construction of customer-deliverable software on a schedule that demands delivery of the first thing built. In most projects,the first system built is( )usable.It may be too slow,too big,awkward to use,or all three.There is no( )but to start again,smarting but smarter,and build a redesigned version in which these problems are solved.The discard and(请作答此空)may be done in one lump,or it may be done piece-by-piece.But all large-system experience shows that it will be done.Where a new system concept or new technology is used,one has to build a system to throw away,for even the best planning is not so omniscient(全知的)as to get it right the first time. The management question,therefore,is not whether to build a pilot system and throw it away.You will do that.The only question is whether to plan in advance to build a______,or to promise to deliver the throwaway to customers.Seen this way,the answer is much clearer.Delivering that throwaway to customers buys time,but it does SO only at the( )of agony(极大痛苦)for the user,distraction for the builders while they do the redesign,and a bad reputation for the product that the best redesign will find hard to live down. Hence plan to throw one away;you will,anyhow.
- 单选题Object-oriented analysis(OO A.is a semiformal specification technique for the object-oriented paradigm.Object-oriented analysis consists of three steps.The first step is( ).It determines how the various results are computed by the product and presents this information in the form of a( )and associated scenarios.The second is(请作答此空),which determines the classes and their attributes.Then determine the interrelationships and interaction among the classes.The last step is( ),which determines the actions performed by or to each class or subclass and presents this information in the form of( ).
- 单选题There is nothing in this world constant but inconstancy.-SWIFT Project after project designs a set of algorithms and then plunges into construction of customer-deliverable software on a schedule that demands delivery of the first thing built. In most projects,the first system built is( )usable.It may be too slow,too big,awkward to use,or all three.There is no( )but to start again,smarting but smarter,and build a redesigned version in which these problems are solved.The discard and( )may be done in one lump,or it may be done piece-by-piece.But all large-system experience shows that it will be done.Where a new system concept or new technology is used,one has to build a system to throw away,for even the best planning is not so omniscient(全知的)as to get it right the first time. The management question,therefore,is not whether to build a pilot system and throw it away.You will do that.The only question is whether to plan in advance to build a( ),or to promise to deliver the throwaway to customers.Seen this way,the answer is much clearer.Delivering that throwaway to customers buys time,but it does SO only at the(请作答此空)of agony(极大痛苦)for the user,distraction for the builders while they do the redesign,and a bad reputation for the product that the best redesign will find hard to live down. Hence plan to throw one away;you will,anyhow.
- 单选题There is nothing in this world constant but inconstancy.-SWIFT Project after project designs a set of algorithms and then plunges into construction of customer-deliverable software on a schedule that demands delivery of the first thing built. In most projects,the first system built is(请作答此空)usable.It may be too slow,too big,awkward to use,or all three.There is no( )but to start again,smarting but smarter,and build a redesigned version in which these problems are solved.The discard and( )may be done in one lump,or it may be done piece-by-piece.But all large-system experience shows that it will be done.Where a new system concept or new technology is used,one has to build a system to throw away,for even the best planning is not so omniscient(全知的)as to get it right the first time. The management question,therefore,is not whether to build a pilot system and throw it away.You will do that.The only question is whether to plan in advance to build a______,or to promise to deliver the throwaway to customers.Seen this way,the answer is much clearer.Delivering that throwaway to customers buys time,but it does SO only at the( )of agony(极大痛苦)for the user,distraction for the builders while they do the redesign,and a bad reputation for the product that the best redesign will find hard to live down. Hence plan to throw one away;you will,anyhow.
- 单选题A.team is( )just a group of people who happen to work together.Teamwork takes practice and it involves special skills.Teams require common processes;they need agreed-upon goals;and they need effective guidance and leadership.The methods for guiding and leading such teams are well known,but they are not obvious.
- 单选题Object-oriented analysis(OO A.is a semiformal specification technique for the object-oriented paradigm.Object-oriented analysis consists of three steps.The first step is( ).It determines how the various results are computed by the product and presents this information in the form of a( )and associated scenarios.The second is( ),which determines the classes and their attributes.Then determine the interrelationships and interaction among the classes.The last step is(请作答此空),which determines the actions performed by or to each class or subclass and presents this information in the form of( ).
- 单选题There is nothing in this world constant but inconstancy.-SWIFT Project after project designs a set of algorithms and then plunges into construction of customer-deliverable software on a schedule that demands delivery of the first thing built. In most projects,the first system built is( )usable.It may be too slow,too big,awkward to use,or all three.There is no( )but to start again,smarting but smarter,and build a redesigned version in which these problems are solved.The discard and( )may be done in one lump,or it may be done piece-by-piece.But all large-system experience shows that it will be done.Where a new system concept or new technology is used,one has to build a system to throw away,for even the best planning is not so omniscient(全知的)as to get it right the first time. The management question,therefore,is not whether to build a pilot system and throw it away.You will do that.The only question is whether to plan in advance to build a(请作答此空),or to promise to deliver the throwaway to customers.Seen this way,the answer is much clearer.Delivering that throwaway to customers buys time,but it does SO only at the( )of agony(极大痛苦)for the user,distraction for the builders while they do the redesign,and a bad reputation for the product that the best redesign will find hard to live down. Hence plan to throw one away;you will,anyhow.
- 单选题对于测试中所发现错误的管理是软件测试的重要环节,以下关于错误管理原则的叙述正确的是( )。
- 单选题测试执行过程的阶段不包括( )。
- 单选题软件评价过程的特性不包括( )。
- 单选题确定测试基线属于( )活动
- 单选题以下关于软件评测过程中的配置管理描述不正确的是( )。
- 单选题关于软件评测过程中的配置管理,( )是不正确的表述。
- 单选题软件配置管理中,基线的种类不包括( )
- 单选题软件配置管理中,基线的种类不包括( )。
- 单选题软件开发中经常利用配置库实现变更控制,主要是控制软件配置项的状态变化,不受配置管理控制的是( )。
- 单选题确定测试基线属于( )活动。
- 单选题以下不属于配置管内容的是( )。
- 单选题成立测试管理小组可以对测试进行统一、规范的管理。测试管理组不包括( )。
- 单选题关于软件测试与软件开发的认识,不正确的是( )
- 单选题下面有关测试管理组点描述中错误的是( )。
- 单选题以下关于文档测试的叙述中,不正确的是( )。
- 单选题以下有关测试文档的重要性中,描述正确的是( )。①验证需求的正确性②检验测试资源③明确任务的风险④决定测试的有效性⑤评价测试结果
- 单选题以下不属于文档测试的测试范围的是( )。
- 单选题( )不属于测试人员编写的文档。
- 单选题与设计测试用例无关的文档是( )。
- 单选题在一个完整的功能测试过程中,( )不属于应该编写的测试文档
- 单选题在一个完整的功能测试过程中,以下不属于应该编写的测试文档的是( )。
- 单选题以下有关软件风险的分类不包括( )。
- 单选题造成软件测试风险的主要原因不包括( )
- 单选题以下有可能导致软件测试发生风险的描述中错误的是( )。
- 单选题造成软件测试风险的主要原因不包括( )。
- 单选题测试成本控制的目标是使测试开发成本、测试实施成本和测试维护成本最小化,以下理解正确的是( )
- 单选题测试成本控制的目标是使测试开发成本、测试实施成本和测试维护成本最小化,以下理解正确的是( )。
- 单选题软件评测师下午场考试一共有( )道题?
- 单选题软件评测师下午场考试第( )道题是必答题?
- 单选题软件评测师每场考试的时间均为( )分钟?
- 单选题软件评测师各个科目均需达到( )分及以上才能及格。
- 单选题软件评测师考试分为( )个科目?