[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-161-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":588},{"id":5,"name":6,"category":7,"favorite":8},161,"(中级) 软件评测师","职业资格",0,20,50,1020,[13,34,46,58,70,82,94,104,116,128,138,150,162,170,182,194,206,214,222,234,246,258,270,282,294,306,314,326,334,346,358,370,382,394,406,418,430,442,454,464,476,488,500,508,520,530,542,554,566,577],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},381142,1,"单选题","Computers will become more advanced and they will also become easier to use.Improved speed recognition will make the operation of a computer easier.Virtual reality（虚拟现实）,the technology of（ ）with a computer using all of the human senses,will also contribute to better human and computer（ ）.Other,exotic（奇异的）models of computation are being developed,including biological computing that uses living organisms,molecular computing that uses molecules with particular（ ）,and computing that uses DNA,the basic unit of heredity（遗传）,to store data and carry out operations.These are examples of possible future computational platforms that,so far,are limited in abilities or are strictly（请作答此空）.Scientists investigate them because of the physical limitations of miniaturizing circuits embedded in silicon.There are also（ ）related to heat generated by even the tiniest of transistors.",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","empirical",false,{"key":24,"text":25,"correct":22},"B","real",{"key":27,"text":28,"correct":22},"C","practical",{"key":30,"text":31,"correct":32},"D","theoretical",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},381143,"Object-oriented analysis（OO A.is a semiformal specification technique for the object-oriented paradigm.Object-oriented analysis consists of three steps.The first step is（ ）.It determines how the various results are computed by the product and presents this information in the form of a（ ）and associated scenarios.The second is（ ），which determines the classes and their attributes.Then determine the interrelationships and interaction among the classes.The last step is（ ）,which determines the actions performed by or to each class or subclass and presents this information in the form of（请作答此空）.",[38,40,42,44],{"key":20,"text":39,"correct":22},"activity diagram",{"key":24,"text":41,"correct":22},"component diagram",{"key":27,"text":43,"correct":22},"sequence diagram",{"key":30,"text":45,"correct":32},"state diagram",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},381144,"Teams are required for most engineering projects．Although some small hardware or software products can be developed by individuals,the scale and complexity of modem systems is such,and the demand for short schedules so great,that it is no longer（ ）for one person to do most engineering jobs．Systems development is a team（ ）,and the effectiveness of the team largely determines the（请作答此空）of the engineermg．Development teams often behave much like baseball or basketball teams．Even though they may have multiple specialties,all the members work toward（ ）．However,on systems maintenance and enhancement teams,the engineers often work relatively independently,much like wrestling and track teams．A team is（ ）just a group of people who happen to work together．Teamwork takes practice and it involves special skills．Teams require common processes;they need agreed-upon goals;and they need effective guidance and leadership．The methods for guiding and leading such teams are well known,but they are not obvious．",[50,52,54,56],{"key":20,"text":51,"correct":22},"size",{"key":24,"text":53,"correct":32},"quality",{"key":27,"text":55,"correct":22},"scale",{"key":30,"text":57,"correct":22},"Complexity",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},381145,"There is nothing in this world constant but inconstancy.—SWIFT Project after project designs a set of algorithms and then plunges into construction of customer-deliverable software on a schedule that demands delivery of the first thing built.In most projects,the first system built is（ ）usable.It may be too slow,too big,awkward to use,or all three.There is no（ ）but to start again,smarting but smarter,and build a redesigned version in which these problems are solved.The discard and（ ）may be done in one lump,or it may be done piece-by-piece.But all large-system experience shows that it will be done.Where a new system concept or new technology is used,one has to build a system to throw away,for even the best planning is not so omniscient（全知的）as to get it right the first time.The management question,therefore,is not whether to build a pilot system and throw it away.You will do that.The only question is whether to plan in advance to build a（请作答此空）,or to promise to deliver the throwaway to customers.Seen this way,the answer is much clearer.Delivering that throwaway to customers buys time,but it does so only at the（ ）of agony（极大痛苦）for the user,distraction for the builders while they do the redesign,and a bad reputation for the product that the best redesign will find hard to live down.Hence plan to throw one away;you will,anyhow.",[62,64,66,68],{"key":20,"text":63,"correct":32},"throwaway",{"key":24,"text":65,"correct":22},"system",{"key":27,"text":67,"correct":22},"software",{"key":30,"text":69,"correct":22},"product",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},381146,"In a world where it seems we already have too much to do，and too many things to think about，it seems the last thing we need is something new that we have to learn.But use cases do solve a problem with requirements:with（请作答此空）declarative equirements it's hard to describle steps and sequences of events.Use cases，stated simply，allow description of sequences of events that，taken together，lead to a system doing something useful.As simple as this sounds，this is important.When confronted only with a pile of requiements，it's often（ ）to make sense of what the authors of the requirements really wanted the system to do.In the preceding example，use cases reduce the ambiguity of the requirements by specifying exactly when and under what conditions certain behavior occurs;as such，the sequence of the behaviors can be regarded as a requirement.Use cases are particularly well suited to capture approaches.Although this may sound simple，the fact is that（ ）equirement capture approaches，with their emphasis on declarative requirements and\"shall\"statements，completely fail to capture the（ ）of the system's behavior.Use cases are a simple yet powerful way to express the behavior of the system in way that all stakeholders can easily understand.But，like anything，use cases come with their own problems，and as useful as they are，they can be（ ）.the result is something that is as bad，if not worse，that the original problem.Therein it's important to utilize use cases effectively without creating a greater problem than the one you started with.",[74,76,78,80],{"key":20,"text":75,"correct":32},"plenty",{"key":24,"text":77,"correct":22},"loose",{"key":27,"text":79,"correct":22},"extra",{"key":30,"text":81,"correct":22},"strict",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},381147,"Teams are required for most engineering projects．Although some small hardware or software products can be developed by individuals,the scale and complexity of modem systems is such,and the demand for short schedules so great,that it is no longer（ ）for one person to do most engineering jobs．Systems development is a team（ ）,and the effectiveness of the team largely determines the（ ）of the engineermg．Development teams often behave much like baseball or basketball teams．Even though they may have multiple specialties,all the members work toward（请作答此空）．However,on systems maintenance and enhancement teams,the engineers often work relatively independently,much like wrestling and track teams．A team is（ ）just a group of people who happen to work together．Teamwork takes practice and it involves special skills．Teams require common processes;they need agreed-upon goals;and they need effective guidance and leadership．The methods for guiding and leading such teams are well known,but they are not obvious．",[86,88,90,92],{"key":20,"text":87,"correct":22},"multiple objectives",{"key":24,"text":89,"correct":22},"different objectives",{"key":27,"text":91,"correct":32},"a single objective",{"key":30,"text":93,"correct":22},"independent objectives",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},381148,"D.evelopment teams often behave much like baseball or basketball teams.Even though they may have multiple specialties,all the members work toward（ ）.However,on systems maintenance and enhancement teams,the engineers often work relatively independently,much like wrestling and track teams. A team is（ ）just a group of people who happen to work together.Teamwork takes practice and it involves special skills.Teams require common processes;they need agreed-upon goals;and they need effective guidance and leadership.The methods for guiding and leading such teams are well known,but they are not obvious.",[98,100,102,103],{"key":20,"text":99,"correct":22},"convenient",{"key":24,"text":101,"correct":22},"existing",{"key":27,"text":28,"correct":32},{"key":30,"text":25,"correct":22},{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":30,"analysis":33},381149,"A.team is（请作答此空）just a group of people who happen to work together.Teamwork takes practice and it involves special skills.Teams require common processes;they need agreed-upon goals;and they need effective guidance and leadership.The methods for guiding and leading such teams are well known,but they are not obvious.",[108,110,112,114],{"key":20,"text":109,"correct":22},"relatively",{"key":24,"text":111,"correct":22},"\u002F",{"key":27,"text":113,"correct":22},"only",{"key":30,"text":115,"correct":32},"more than",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":20,"analysis":33},381150,"There is nothing in this world constant but inconstancy.-SWIFT Project after project designs a set of algorithms and then plunges into construction of customer-deliverable software on a schedule that demands delivery of the first thing built. In most projects,the first system built is（ ）usable.It may be too slow,too big,awkward to use,or all three.There is no（请作答此空）but to start again,smarting but smarter,and build a redesigned version in which these problems are solved.The discard and（ ）may be done in one lump,or it may be done piece-by-piece.But all large-system experience shows that it will be done.Where a new system concept or new technology is used,one has to build a system to throw away,for even the best planning is not so omniscient（全知的）as to get it right the first time. The management question,therefore,is not whether to build a pilot system and throw it away.You will do that.The only question is whether to plan in advance to build a______,or to promise to deliver the throwaway to customers.Seen this way,the answer is much clearer.Delivering that throwaway to customers buys time,but it does SO only at the（ ）of agony（极大痛苦）for the user,distraction for the builders while they do the redesign,and a bad reputation for the product that the best redesign will find hard to live down. Hence plan to throw one away;you will,anyhow.",[120,122,124,126],{"key":20,"text":121,"correct":32},"alternative",{"key":24,"text":123,"correct":22},"need",{"key":27,"text":125,"correct":22},"possibility",{"key":30,"text":127,"correct":22},"solution",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":27,"analysis":33},381151,"Object-oriented analysis（OO A.is a semiformal specification technique for the object-oriented paradigm.Object-oriented analysis consists of three steps.The first step is（ ）.It determines how the various results are computed by the product and presents this information in the form of a（请作答此空）and associated scenarios.The second is（ ），which determines the classes and their attributes.Then determine the interrelationships and interaction among the classes.The last step is（ ）,which determines the actions performed by or to each class or subclass and presents this information in the form of（ ）.",[132,134,135,137],{"key":20,"text":133,"correct":22},"collaboration diagram",{"key":24,"text":43,"correct":22},{"key":27,"text":136,"correct":32},"use-case diagram",{"key":30,"text":39,"correct":22},{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":20,"analysis":33},381154,"Object-oriented analysis（OO A.is a semiformal specification technique for the object-oriented paradigm.Object-oriented analysis consists of three steps.The first step is（请作答此空）.It determines how the various results are computed by the product and presents this information in the form of a（ ）and associated scenarios.The second is（ ），which determines the classes and their attributes.Then determine the interrelationships and interaction among the classes.The last step is（ ）,which determines the actions performed by or to each class or subclass and presents this information in the form of（ ）.",[142,144,146,148],{"key":20,"text":143,"correct":32},"use-case modeling",{"key":24,"text":145,"correct":22},"class modeling",{"key":27,"text":147,"correct":22},"dynamic modeling",{"key":30,"text":149,"correct":22},"behavioral modeling",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":24,"analysis":33},381155,"There is nothing in this world constant but inconstancy.-SWIFT Project after project designs a set of algorithms and then plunges into construction of customer-deliverable software on a schedule that demands delivery of the first thing built. In most projects,the first system built is（ ）usable.It may be too slow,too big,awkward to use,or all three.There is no（ ）but to start again,smarting but smarter,and build a redesigned version in which these problems are solved.The discard and（请作答此空）may be done in one lump,or it may be done piece-by-piece.But all large-system experience shows that it will be done.Where a new system concept or new technology is used,one has to build a system to throw away,for even the best planning is not so omniscient（全知的）as to get it right the first time. The management question,therefore,is not whether to build a pilot system and throw it away.You will do that.The only question is whether to plan in advance to build a______,or to promise to deliver the throwaway to customers.Seen this way,the answer is much clearer.Delivering that throwaway to customers buys time,but it does SO only at the（ ）of agony（极大痛苦）for the user,distraction for the builders while they do the redesign,and a bad reputation for the product that the best redesign will find hard to live down. Hence plan to throw one away;you will,anyhow.",[154,156,158,160],{"key":20,"text":155,"correct":22},"design",{"key":24,"text":157,"correct":32},"redesign",{"key":27,"text":159,"correct":22},"plan",{"key":30,"text":161,"correct":22},"build",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":24,"analysis":33},381156,"Object-oriented analysis（OO A.is a semiformal specification technique for the object-oriented paradigm.Object-oriented analysis consists of three steps.The first step is（ ）.It determines how the various results are computed by the product and presents this information in the form of a（ ）and associated scenarios.The second is（请作答此空），which determines the classes and their attributes.Then determine the interrelationships and interaction among the classes.The last step is（ ）,which determines the actions performed by or to each class or subclass and presents this information in the form of（ ）.",[166,167,168,169],{"key":20,"text":143,"correct":22},{"key":24,"text":145,"correct":32},{"key":27,"text":147,"correct":22},{"key":30,"text":149,"correct":22},{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":27,"analysis":33},381157,"There is nothing in this world constant but inconstancy.-SWIFT Project after project designs a set of algorithms and then plunges into construction of customer-deliverable software on a schedule that demands delivery of the first thing built. In most projects,the first system built is（ ）usable.It may be too slow,too big,awkward to use,or all three.There is no（ ）but to start again,smarting but smarter,and build a redesigned version in which these problems are solved.The discard and（ ）may be done in one lump,or it may be done piece-by-piece.But all large-system experience shows that it will be done.Where a new system concept or new technology is used,one has to build a system to throw away,for even the best planning is not so omniscient（全知的）as to get it right the first time. The management question,therefore,is not whether to build a pilot system and throw it away.You will do that.The only question is whether to plan in advance to build a（ ）,or to promise to deliver the throwaway to customers.Seen this way,the answer is much clearer.Delivering that throwaway to customers buys time,but it does SO only at the（请作答此空）of agony（极大痛苦）for the user,distraction for the builders while they do the redesign,and a bad reputation for the product that the best redesign will find hard to live down. Hence plan to throw one away;you will,anyhow.",[174,176,178,180],{"key":20,"text":175,"correct":22},"worth",{"key":24,"text":177,"correct":22},"value",{"key":27,"text":179,"correct":32},"cost",{"key":30,"text":181,"correct":22},"invaluable",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":30,"analysis":33},381158,"There is nothing in this world constant but inconstancy.-SWIFT Project after project designs a set of algorithms and then plunges into construction of customer-deliverable software on a schedule that demands delivery of the first thing built. In most projects,the first system built is（请作答此空）usable.It may be too slow,too big,awkward to use,or all three.There is no（ ）but to start again,smarting but smarter,and build a redesigned version in which these problems are solved.The discard and（ ）may be done in one lump,or it may be done piece-by-piece.But all large-system experience shows that it will be done.Where a new system concept or new technology is used,one has to build a system to throw away,for even the best planning is not so omniscient（全知的）as to get it right the first time. The management question,therefore,is not whether to build a pilot system and throw it away.You will do that.The only question is whether to plan in advance to build a______,or to promise to deliver the throwaway to customers.Seen this way,the answer is much clearer.Delivering that throwaway to customers buys time,but it does SO only at the（ ）of agony（极大痛苦）for the user,distraction for the builders while they do the redesign,and a bad reputation for the product that the best redesign will find hard to live down. Hence plan to throw one away;you will,anyhow.",[186,188,190,192],{"key":20,"text":187,"correct":22},"almost",{"key":24,"text":189,"correct":22},"often",{"key":27,"text":191,"correct":22},"usually",{"key":30,"text":193,"correct":32},"barely",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":20,"analysis":33},381159,"A.team is（ ）just a group of people who happen to work together.Teamwork takes practice and it involves special skills.Teams require common processes;they need agreed-upon goals;and they need effective guidance and leadership.The methods for guiding and leading such teams are well known,but they are not obvious.",[198,200,202,204],{"key":20,"text":199,"correct":32},"activity",{"key":24,"text":201,"correct":22},"job",{"key":27,"text":203,"correct":22},"process",{"key":30,"text":205,"correct":22},"application",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":27,"analysis":33},381160,"Object-oriented analysis（OO A.is a semiformal specification technique for the object-oriented paradigm.Object-oriented analysis consists of three steps.The first step is（ ）.It determines how the various results are computed by the product and presents this information in the form of a（ ）and associated scenarios.The second is（ ），which determines the classes and their attributes.Then determine the interrelationships and interaction among the classes.The last step is（请作答此空）,which determines the actions performed by or to each class or subclass and presents this information in the form of（ ）.",[210,211,212,213],{"key":20,"text":143,"correct":22},{"key":24,"text":145,"correct":22},{"key":27,"text":147,"correct":32},{"key":30,"text":149,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},381161,"There is nothing in this world constant but inconstancy.-SWIFT Project after project designs a set of algorithms and then plunges into construction of customer-deliverable software on a schedule that demands delivery of the first thing built. In most projects,the first system built is（ ）usable.It may be too slow,too big,awkward to use,or all three.There is no（ ）but to start again,smarting but smarter,and build a redesigned version in which these problems are solved.The discard and（ ）may be done in one lump,or it may be done piece-by-piece.But all large-system experience shows that it will be done.Where a new system concept or new technology is used,one has to build a system to throw away,for even the best planning is not so omniscient（全知的）as to get it right the first time. The management question,therefore,is not whether to build a pilot system and throw it away.You will do that.The only question is whether to plan in advance to build a（请作答此空）,or to promise to deliver the throwaway to customers.Seen this way,the answer is much clearer.Delivering that throwaway to customers buys time,but it does SO only at the（ ）of agony（极大痛苦）for the user,distraction for the builders while they do the redesign,and a bad reputation for the product that the best redesign will find hard to live down. Hence plan to throw one away;you will,anyhow.",[218,219,220,221],{"key":20,"text":63,"correct":32},{"key":24,"text":65,"correct":22},{"key":27,"text":67,"correct":22},{"key":30,"text":69,"correct":22},{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":27,"analysis":33},381162,"对于测试中所发现错误的管理是软件测试的重要环节，以下关于错误管理原则的叙述正确的是（ ）。",[226,228,230,232],{"key":20,"text":227,"correct":22},"测试人员发现的错误应直接提交给开发人员进行错误修复",{"key":24,"text":229,"correct":22},"若程序员发现报告的错误实际不是错误，可单方面决定拒绝进行错误修复",{"key":27,"text":231,"correct":32},"每次对错误的处理都要保留处理者姓名、处理时间、处理步骤、错误的当前状态等详细处理信息，即使某次处理并未对错误进行修复",{"key":30,"text":233,"correct":22},"错误修复后可以由报告错误的测试人员之外的其他测试人员进行验证，只要可以确认错误已经修复，就可以关闭错误",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":27,"analysis":33},381164,"测试执行过程的阶段不包括（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":22},"初测期",{"key":24,"text":241,"correct":22},"回归测试期",{"key":27,"text":243,"correct":32},"系统测试期",{"key":30,"text":245,"correct":22},"细测期",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},381165,"软件评价过程的特性不包括（ ）。",[250,252,254,256],{"key":20,"text":251,"correct":32},"正确性",{"key":24,"text":253,"correct":22},"可重复性",{"key":27,"text":255,"correct":22},"可再现性",{"key":30,"text":257,"correct":22},"客观性",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":24,"analysis":33},381166,"确定测试基线属于（ ）活动",[262,264,266,268],{"key":20,"text":263,"correct":22},"配置项表示",{"key":24,"text":265,"correct":32},"配置项控制",{"key":27,"text":267,"correct":22},"配置状态报告",{"key":30,"text":269,"correct":22},"配置审计",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":24,"analysis":33},381167,"以下关于软件评测过程中的配置管理描述不正确的是（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":22},"测试活动的配置管理属于整个软件项目配置管理的一部分。",{"key":24,"text":277,"correct":32},"软件评测配置管理包括4个基本的活动，配置项变更控制、配置状态报告、配置审计、配置管理委员会建立。",{"key":27,"text":279,"correct":22},"配置项变更控制要规定测试基线、对每个基线进行描述。",{"key":30,"text":281,"correct":22},"配置状态报告要确认过程记录、跟踪问题报告、更改请求以及更改次序等。",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":24,"analysis":33},381168,"关于软件评测过程中的配置管理，（ ）是不正确的表述。",[286,288,290,292],{"key":20,"text":287,"correct":22},"测试活动的配置管理属于整个软件项目配置管理的一部分",{"key":24,"text":289,"correct":32},"软件评测配置管理包括4个基本的活动，配置项变更控制、配置状态报告、配置审计、配置管理委员会建立",{"key":27,"text":291,"correct":22},"配置项变更控制要规定测试基线、对每个基线进行描述",{"key":30,"text":293,"correct":22},"配置状态报告要确认过程记录、跟踪问题报告、更改请求以及更改次序等",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":30,"analysis":33},381169,"软件配置管理中，基线的种类不包括（ ）",[298,300,302,304],{"key":20,"text":299,"correct":22},"功能基线",{"key":24,"text":301,"correct":22},"分配基线",{"key":27,"text":303,"correct":22},"产品基线",{"key":30,"text":305,"correct":32},"模块基线",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":30,"analysis":33},381170,"软件配置管理中，基线的种类不包括（ ）。",[310,311,312,313],{"key":20,"text":299,"correct":22},{"key":24,"text":301,"correct":22},{"key":27,"text":303,"correct":22},{"key":30,"text":305,"correct":32},{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":20,"analysis":33},381171,"软件开发中经常利用配置库实现变更控制，主要是控制软件配置项的状态变化，不受配置管理控制的是（ ）。",[318,320,322,324],{"key":20,"text":319,"correct":32},"自由状态",{"key":24,"text":321,"correct":22},"工作状态",{"key":27,"text":323,"correct":22},"评审状态",{"key":30,"text":325,"correct":22},"受控状态",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":24,"analysis":33},381172,"确定测试基线属于（ ）活动。",[330,331,332,333],{"key":20,"text":263,"correct":22},{"key":24,"text":265,"correct":32},{"key":27,"text":267,"correct":22},{"key":30,"text":269,"correct":22},{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},381173,"以下不属于配置管内容的是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"确立基线",{"key":24,"text":341,"correct":32},"建立3库：开发库、测试库和产品库。",{"key":27,"text":343,"correct":22},"出入库管理和审计",{"key":30,"text":345,"correct":22},"状态报告和查询",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":27,"analysis":33},381174,"成立测试管理小组可以对测试进行统一、规范的管理。测试管理组不包括（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"评审小组",{"key":24,"text":353,"correct":22},"测试小组",{"key":27,"text":355,"correct":32},"开发小组",{"key":30,"text":357,"correct":22},"支持小组",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},381175,"关于软件测试与软件开发的认识，不正确的是（ ）",[362,364,366,368],{"key":20,"text":363,"correct":22},"软件生命周期各个阶段都可能产生错误",{"key":24,"text":365,"correct":32},"软件测试是独立于软件开发的一个工作",{"key":27,"text":367,"correct":22},"软件开发的需求分析和设计阶段就应开始测试工作",{"key":30,"text":369,"correct":22},"测试越早进行，越有助于提高被测软件的质量",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},381176,"下面有关测试管理组点描述中错误的是（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":32},"评审小组可由业务人员，开发人员等组成，用户不能参与。",{"key":24,"text":377,"correct":22},"测试小组实行“组长负责制”，负责工作安排，对整个测试过程和产品质量进行总结和评价。",{"key":27,"text":379,"correct":22},"评审小组负责软件定义评审，软件需求评审，详细设计评审，软件实现评审和软件验收评审",{"key":30,"text":381,"correct":22},"支持小组负责网络管理，数据备份，文档管理，设备管理和维护，员工内部培训。",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},381177,"以下关于文档测试的叙述中，不正确的是（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":32},"文档要面向所有级别读者",{"key":24,"text":389,"correct":22},"文档中用到的术语要符合行业规范",{"key":27,"text":391,"correct":22},"需要检查所有信息是否真实正确",{"key":30,"text":393,"correct":22},"需要检查软件返回结果跟文档描述是否一致",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":30,"analysis":33},381178,"以下有关测试文档的重要性中，描述正确的是（ ）。①验证需求的正确性②检验测试资源③明确任务的风险④决定测试的有效性⑤评价测试结果",[398,400,402,404],{"key":20,"text":399,"correct":22},"①②③④",{"key":24,"text":401,"correct":22},"①③④⑤",{"key":27,"text":403,"correct":22},"①②④⑤",{"key":30,"text":405,"correct":32},"①②③④⑤",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},381179,"以下不属于文档测试的测试范围的是（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"软件开发计划",{"key":24,"text":413,"correct":32},"数据库脚本",{"key":27,"text":415,"correct":22},"测试分析报告",{"key":30,"text":417,"correct":22},"用户手册",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":27,"analysis":33},381180,"（ ）不属于测试人员编写的文档。",[422,424,426,428],{"key":20,"text":423,"correct":22},"缺陷报告",{"key":24,"text":425,"correct":22},"测试环境配置文档",{"key":27,"text":427,"correct":32},"缺陷修复报告",{"key":30,"text":429,"correct":22},"测试用例说明文档",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},381181,"与设计测试用例无关的文档是（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":32},"项目开发计划",{"key":24,"text":437,"correct":22},"需求规格说明书",{"key":27,"text":439,"correct":22},"概要设计说明书",{"key":30,"text":441,"correct":22},"源程序",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":27,"analysis":33},381182,"在一个完整的功能测试过程中，（ ）不属于应该编写的测试文档",[446,448,450,452],{"key":20,"text":447,"correct":22},"测试需求文档",{"key":24,"text":449,"correct":22},"测试用例文档",{"key":27,"text":451,"correct":32},"测试标准",{"key":30,"text":453,"correct":22},"问题报告单",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":30,"analysis":33},381183,"在一个完整的功能测试过程中，以下不属于应该编写的测试文档的是（ ）。",[458,459,461,462],{"key":20,"text":449,"correct":22},{"key":24,"text":460,"correct":22},"测试缺陷报告",{"key":27,"text":447,"correct":22},{"key":30,"text":463,"correct":32},"测试标准文档",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":30,"analysis":33},381184,"以下有关软件风险的分类不包括（ ）。",[468,470,472,474],{"key":20,"text":469,"correct":22},"项目风险",{"key":24,"text":471,"correct":22},"技术风险",{"key":27,"text":473,"correct":22},"商业风险",{"key":30,"text":475,"correct":32},"设备风险",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":30,"analysis":33},381185,"造成软件测试风险的主要原因不包括（ ）",[480,482,484,486],{"key":20,"text":481,"correct":22},"测试计划的不充分",{"key":24,"text":483,"correct":22},"测试方法有误",{"key":27,"text":485,"correct":22},"测试过程的偏离",{"key":30,"text":487,"correct":32},"软件设计方案有误",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":27,"analysis":33},381186,"以下有可能导致软件测试发生风险的描述中错误的是（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":22},"缺少详细的需求分析和设计文档",{"key":24,"text":495,"correct":22},"功能模块漏测，导致覆盖率不达标",{"key":27,"text":497,"correct":32},"实行敏捷开发导致缺少充分的文档",{"key":30,"text":499,"correct":22},"测试内部工作得不到足够的重视",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":27,"analysis":33},381187,"造成软件测试风险的主要原因不包括（ ）。",[504,505,506,507],{"key":20,"text":481,"correct":22},{"key":24,"text":483,"correct":22},{"key":27,"text":487,"correct":32},{"key":30,"text":485,"correct":22},{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":24,"analysis":33},381188,"测试成本控制的目标是使测试开发成本、测试实施成本和测试维护成本最小化，以下理解正确的是（ ）",[512,514,516,518],{"key":20,"text":513,"correct":22},"测试准备成本属于测试实施成本",{"key":24,"text":515,"correct":32},"可以通过加强软件测试的配置管理来降低测试维护成本",{"key":27,"text":517,"correct":22},"测试设计成本控制的目标是尽可能地减少测试总执行时间和所需的测试专用设备",{"key":30,"text":519,"correct":22},"回归测试将测试案例全部重新执行一边，可以将测试维护成本降至最低",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":24,"analysis":33},381189,"测试成本控制的目标是使测试开发成本、测试实施成本和测试维护成本最小化，以下理解正确的是（ ）。",[524,526,527,528],{"key":20,"text":525,"correct":22},"测试准备成本就是测试实施成本",{"key":24,"text":515,"correct":32},{"key":27,"text":517,"correct":22},{"key":30,"text":529,"correct":22},"回归测试将测试案例全部重新执行一遍，可以将测试维护成本降至最低",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":24,"analysis":33},381190,"软件评测师下午场考试一共有（ ）道题？",[534,536,538,540],{"key":20,"text":535,"correct":22},"4",{"key":24,"text":537,"correct":32},"5",{"key":27,"text":539,"correct":22},"6",{"key":30,"text":541,"correct":22},"7",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":20,"analysis":33},381191,"软件评测师下午场考试第（ ）道题是必答题？",[546,548,550,552],{"key":20,"text":547,"correct":32},"1,2",{"key":24,"text":549,"correct":22},"2,3",{"key":27,"text":551,"correct":22},"3,4",{"key":30,"text":553,"correct":22},"4,5",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":30,"analysis":33},381192,"软件评测师每场考试的时间均为（ ）分钟？",[558,560,562,564],{"key":20,"text":559,"correct":22},"90",{"key":24,"text":561,"correct":22},"100",{"key":27,"text":563,"correct":22},"120",{"key":30,"text":565,"correct":32},"150",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":20,"analysis":33},381193,"软件评测师各个科目均需达到（ ）分及以上才能及格。",[570,572,574,576],{"key":20,"text":571,"correct":32},"45",{"key":24,"text":573,"correct":22},"60",{"key":27,"text":575,"correct":22},"75",{"key":30,"text":561,"correct":22},{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":27,"analysis":33},381194,"软件评测师考试分为（ ）个科目？",[581,582,584,586],{"key":20,"text":535,"correct":22},{"key":24,"text":583,"correct":22},"3",{"key":27,"text":585,"correct":32},"2",{"key":30,"text":587,"correct":22},"1",[589,593,596,599,602,605],{"id":590,"name":591,"category":7,"favorite":592},136,"法律职业试卷二(客观题 )",2,{"id":594,"name":595,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":597,"name":598,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":600,"name":601,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":603,"name":604,"category":7,"favorite":8},28,"安全工程师",{"id":606,"name":607,"category":7,"favorite":8},112,"安全生产法律知识"]