[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-161-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":569},{"id":5,"name":6,"category":7,"favorite":8},161,"(中级) 软件评测师","职业资格",0,13,50,1020,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,200,209,221,230,239,249,261,273,285,297,309,318,330,342,354,362,371,383,395,404,412,424,432,442,454,466,478,490,499,511,519,531,539,547,557],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},380741,1,"单选题","以下关于软件测试的描述中，正确的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","测试开始越早，越有利于发现软件缺陷",true,{"key":24,"text":25,"correct":26},"B","采用正确的测试用例设计方法，软件测试可以做到穷举测试",false,{"key":28,"text":29,"correct":26},"C","测试覆盖度和测试用例数量成正比",{"key":31,"text":32,"correct":26},"D","软件测试的时间越长越好","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},380742,"软件测试的目的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"试验性运行软件",{"key":24,"text":41,"correct":26},"找出软件中全部错误",{"key":28,"text":43,"correct":26},"找出软件中全部的错误",{"key":31,"text":45,"correct":22},"发现软件错误",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},380743,"在进行软件编码规范评测过程中需要围绕几个方面的内容展开，以下描述中不属于编码规范评测内容的有（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"源程序文档化检查，包括符号名的命名、程序的注释等规范性检查",{"key":24,"text":53,"correct":26},"数据说明检查，包括数据说明次序、语句中变量顺序检查",{"key":28,"text":55,"correct":26},"程序结构检查，程序应采用基本的控制结构、避免不必要的转移控制等",{"key":31,"text":57,"correct":22},"程序逻辑检查，阅读源代码，比较实际程序控制流与程序设计控制流的区别",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},380744,"下列技术不属于软件可靠性设计技术（ ）",[62,64,66,68],{"key":20,"text":63,"correct":26},"容错设计",{"key":24,"text":65,"correct":26},"检错设计",{"key":28,"text":67,"correct":26},"降低复杂度设计",{"key":31,"text":69,"correct":22},"并发性设计",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},380745,"标准符合性测试就是测量产品的功能和性能指标，与相关国家标准或行业标准所规定的功能和性能指标之间符合程度的测试活动。它区别于一般的测试，标准符合性测试依据和测试规程一定是国家标准或行业标准，而不是实验室自定义的或其他的有关文件。（ ）是委托授权的机构对厂商的产品进行测试，测试机构将出具规范化的测试报告，作为进一步产品标准化认证的技术依据。",[74,76,78,80],{"key":20,"text":75,"correct":26},"自律测试",{"key":24,"text":77,"correct":22},"权威测试",{"key":28,"text":79,"correct":26},"国家测试",{"key":31,"text":81,"correct":26},"委托测试",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},380746,"软件开发中经常利用配置库实现变更控制，主要是控制软件配置项的状态变化，不受配置管理控制的是（ ）",[86,88,90,92],{"key":20,"text":87,"correct":22},"自由状态",{"key":24,"text":89,"correct":26},"工作状态",{"key":28,"text":91,"correct":26},"评审状态",{"key":31,"text":93,"correct":26},"受控状态",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},380747,"测试用例是测试使用的文档化的细则，其规定如何对软件某项功能或功能组合进行测试。测试用例应包括下列（ ）内容的详细信息。①测试目标和被测功能。②测试环境和其他条件。③测试数据和测试步骤。④测试记录和测试结果。",[98,100,102,104],{"key":20,"text":99,"correct":26},"①③",{"key":24,"text":101,"correct":22},"①②③",{"key":28,"text":103,"correct":26},"①③④",{"key":31,"text":105,"correct":26},"①②③④",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},380748,"以下不能作为测试结束标准的是（ ）",[110,112,114,116],{"key":20,"text":111,"correct":26},"测试超过了预定时间",{"key":24,"text":113,"correct":26},"执行完了所有测试用例但没有发现新的故障",{"key":28,"text":115,"correct":26},"单位时间内查出的故障数目低于预定值",{"key":31,"text":117,"correct":22},"测试人员或者其它资源不足",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},380749,"以下不属于软件测试工具的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"JMeter",{"key":24,"text":125,"correct":26},"LoadRunner",{"key":28,"text":127,"correct":26},"JTest",{"key":31,"text":129,"correct":22},"JBuilder",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},380750,"A.阅读和理解标准b.确定测试工具c.执行用例文件d.确定用例文件e.分析测试结果",[134,136,138,140],{"key":20,"text":135,"correct":26},"abcde",{"key":24,"text":137,"correct":26},"acebe",{"key":28,"text":139,"correct":26},"abdec",{"key":31,"text":141,"correct":22},"abdce",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},380751,"（ ）不属于功能测试用例构成元素。",[146,148,150,152],{"key":20,"text":147,"correct":26},"测试数据",{"key":24,"text":149,"correct":26},"测试步骤",{"key":28,"text":151,"correct":26},"预期结果",{"key":31,"text":153,"correct":22},"实测结果",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},380752,"使用软件测试工具的目的不包括（ ）",[158,160,162,164],{"key":20,"text":159,"correct":26},"帮助测试寻找问题",{"key":24,"text":161,"correct":26},"协助问题的诊断",{"key":28,"text":163,"correct":26},"节省测试时间",{"key":31,"text":165,"correct":22},"提高设计质量",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},380753,"以下关于回归测试的叙述中，不正确的是（ ）",[170,172,174,176],{"key":20,"text":171,"correct":26},"回归测试是为了确保改动不会带来不可预料的后果或错误",{"key":24,"text":173,"correct":26},"回归测试需要针对修改过的软件成分进行测试",{"key":28,"text":175,"correct":26},"回归测试需要能够测试软件的所有功能的代表性测试用例",{"key":31,"text":177,"correct":22},"回归测试不容易实现自动化",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},380754,"以下关于测试原则的叙述中，不正确的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"测试贯穿于全部软件生命周期，并不是实现完成后才开始",{"key":24,"text":185,"correct":22},"测试用例本身不需要测试",{"key":28,"text":187,"correct":26},"测试用例需要逐步完善、不断修订",{"key":31,"text":189,"correct":26},"当缺陷成群集中出现时，测试时应该更多关注这些缺陷群",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},380755,"数据库测试的对象包括（ ）①数据库连接②数据库的安全测试③定义的存储过程和触发器的测试④数据库接口测试",[194,196,197,199],{"key":20,"text":195,"correct":26},"①④",{"key":24,"text":101,"correct":26},{"key":28,"text":198,"correct":26},"①②④",{"key":31,"text":105,"correct":22},{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":31,"analysis":33},380756,"以下关于软件质量特性测试的叙述，正确的是（ ）。①成熟性测试是检验软件系统故障，或违反指定接口的情况下维持规定的性能水平有关的测试工作②功能性测试是检验适合性、准确性、互操作性、安全保密性、功能依从性的测试工作③易学性测试是检查系统中用户为操作和运行控制所花努力有关的测试工作④效率测试是指在规定条件下产品执行其功能时，对时间消耗及资源利用的测试工作",[204,205,206,207],{"key":20,"text":105,"correct":26},{"key":24,"text":195,"correct":26},{"key":28,"text":103,"correct":26},{"key":31,"text":208,"correct":22},"②④",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":31,"analysis":33},380757,"通用的风险分析表应包括（ ）。①风险问题②发生的可能性③影响的严重性④风险预测值⑤风险优先级",[213,215,217,219],{"key":20,"text":214,"correct":26},"①②③⑤",{"key":24,"text":216,"correct":26},"①②④⑤",{"key":28,"text":218,"correct":26},"①③④⑤",{"key":31,"text":220,"correct":22},"①②③④⑤",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":31,"analysis":33},380758,"以下属于影响软件可靠性因素的是（ ）。 ①软件运行剖面②软件规模 ③软件内部结构④软件的开发方法和开发环境 ⑤软件的可靠性投入",[225,227,228,229],{"key":20,"text":226,"correct":26},"①②",{"key":24,"text":101,"correct":26},{"key":28,"text":105,"correct":26},{"key":31,"text":220,"correct":22},{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":31,"analysis":33},380760,"在进行可用性测试时关注的问题应包括（ ）。 ①安装过程是否困难②错误提示是否明确③GUI接口是否标准④登录是否方便⑤帮助文本是否上下文敏感",[234,235,237,238],{"key":20,"text":226,"correct":26},{"key":24,"text":236,"correct":26},"①③③",{"key":28,"text":105,"correct":26},{"key":31,"text":220,"correct":22},{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":33,"analysis":33},380761,"以下不属于软件测试对象的有（ ）项。①需求规格说明书②软件的程序模块③概要设计说明书与详细设计说明书④软件的用户手册",[243,245,247],{"key":20,"text":244,"correct":26},"2",{"key":24,"text":246,"correct":26},"3",{"key":28,"text":248,"correct":26},"4",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":24,"analysis":33},380762,"产品的功能性测试的内容不包括（ ）",[253,255,257,259],{"key":20,"text":254,"correct":26},"适合性",{"key":24,"text":256,"correct":22},"易用性",{"key":28,"text":258,"correct":26},"正确性",{"key":31,"text":260,"correct":26},"互操作性",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},380763,"（ ）不是正确的软件测试目的",[265,267,269,271],{"key":20,"text":266,"correct":26},"尽最大的可能找出最多的错误",{"key":24,"text":268,"correct":22},"设计一个好的测试用例对用户需求的覆盖度达到100%",{"key":28,"text":270,"correct":26},"对软件质量进行度量和评估，以提高软件的质量",{"key":31,"text":272,"correct":26},"发现开发所采用的软件过程的缺陷，进行软件过程改进",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":20,"analysis":33},380764,"软件测试原则中指出“完全测试是不可能的”，主要原因是（ ）",[277,279,281,283],{"key":20,"text":278,"correct":22},"输入量太大、输出结果太多以及路径组合太多",{"key":24,"text":280,"correct":26},"自动化测试技术不够完善",{"key":28,"text":282,"correct":26},"测试的时间和人员有限",{"key":31,"text":284,"correct":26},"仅仅靠黑盒测试不能达到完全测试",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":28,"analysis":33},380765,"关于软件测试与质量保证，正确的理解的是（ ）",[289,291,293,295],{"key":20,"text":290,"correct":26},"软件测试关注的是过程中的活动，软件质量保证关注的是过程的产物",{"key":24,"text":292,"correct":26},"软件测试不是软件质量保证工作中的内容",{"key":28,"text":294,"correct":22},"软件测试是软件质量保证的重要手段",{"key":31,"text":296,"correct":26},"软件质量保证人员就是软件测试人员",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":28,"analysis":33},380766,"以下关于软件测试的概念，正确的是（ ）。",[301,303,305,307],{"key":20,"text":302,"correct":26},"软件测试的目的是想证实在一个给定的外部环境中软件的逻辑正确性，即保证软件以正确的方式来做这个事件",{"key":24,"text":304,"correct":26},"软件质量保证的基本措施就是对软件进行确认测试",{"key":28,"text":306,"correct":22},"软件测试的对象不仅仅是程序，文档、数据和规程都是软件测试的对象",{"key":31,"text":308,"correct":26},"单元测试可检验程序单元或部件的接口关系，应能发现并排除在模块连接中可能发生的问题",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":31,"analysis":33},380767,"以下不属于软件测试工具的是（ ）",[313,314,316,317],{"key":20,"text":123,"correct":26},{"key":24,"text":315,"correct":26},"Loadrunner",{"key":28,"text":127,"correct":26},{"key":31,"text":129,"correct":22},{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":28,"analysis":33},380769,"以下关于测试时机的叙述中，不正确的是（ ）",[322,324,326,328],{"key":20,"text":323,"correct":26},"应该尽可能早地进行测试",{"key":24,"text":325,"correct":26},"软件测试中的错误暴露的越迟，则修复和改正错误所花费的代价越高",{"key":28,"text":327,"correct":22},"应该在代码编写完成后开始测试",{"key":31,"text":329,"correct":26},"项目需求分析和设计阶段需要测试人员参与",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":28,"analysis":33},380770,"以下关于测试计划的叙述中，不正确的是（ ）",[334,336,338,340],{"key":20,"text":335,"correct":26},"测试计划能使测试工作顺利进行",{"key":24,"text":337,"correct":26},"测试计划能使项目参与人员沟通顺畅",{"key":28,"text":339,"correct":22},"测试计划无益于提高软件质量",{"key":31,"text":341,"correct":26},"测试计划是软件过程规范化的要求",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},380771,"以下描述可以作为软件测试结束的标志的是（ ）。",[346,348,350,352],{"key":20,"text":347,"correct":26},"使用了特定的测试用例",{"key":24,"text":349,"correct":22},"错误强度曲线下降到预定的水平",{"key":28,"text":351,"correct":26},"查出了预定数目的错误",{"key":31,"text":353,"correct":26},"按照测试计划中所规定的时间进行了测试",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":28,"analysis":33},380773,"以下关于测试计划的叙述中，不正确的是（ ）。",[358,359,360,361],{"key":20,"text":335,"correct":26},{"key":24,"text":337,"correct":26},{"key":28,"text":339,"correct":22},{"key":31,"text":341,"correct":26},{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":24,"analysis":33},380774,"以下属于测试停止依据的是（ ）①测试用例全部执行结束②测试覆盖率达到要求③测试超出了预定时间④查出了预定数目的故障 ⑤执行了预定的测试方案⑥测试时间不足",[366,368,369,370],{"key":20,"text":367,"correct":26},"①②③④⑤⑥",{"key":24,"text":220,"correct":22},{"key":28,"text":105,"correct":26},{"key":31,"text":101,"correct":26},{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":31,"analysis":33},380775,"测试用例的三要素不包括（ ）",[375,377,379,381],{"key":20,"text":376,"correct":26},"输入",{"key":24,"text":378,"correct":26},"预期输出",{"key":28,"text":380,"correct":26},"执行条件",{"key":31,"text":382,"correct":22},"实际输出",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":28,"analysis":33},380776,"软件测试的对象不包括（ ）",[387,389,391,393],{"key":20,"text":388,"correct":26},"软件代码",{"key":24,"text":390,"correct":26},"软件文档",{"key":28,"text":392,"correct":22},"质量保证方法",{"key":31,"text":394,"correct":26},"相关数据",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":28,"analysis":33},380777,"以下关于测试时机的叙述中，正确的是（ ）①应该尽可能早地进行测试②软件中的错误暴露得越迟，则修复和改正错误所花费的代价就越高③应该在代码编写完成后开始测试④项目需求分析和设计阶段不需要测试人员参与",[399,400,401,402],{"key":20,"text":105,"correct":26},{"key":24,"text":101,"correct":26},{"key":28,"text":226,"correct":22},{"key":31,"text":403,"correct":26},"①",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":31,"analysis":33},380778,"以下关于软件测试原则的叙述中，正确的是（ ）①测试开始得越早，越有利于发现缺陷②测试覆盖率和测试用例数量成正比③测试用例既需选用合理的输入数据，又需要选择不合理的输入数据④应制定测试计划并严格执行，排除随意性⑤采用合适的测试方法，可以做到穷举测试⑥程序员应尽量测试自己的程序",[408,409,410,411],{"key":20,"text":367,"correct":26},{"key":24,"text":220,"correct":26},{"key":28,"text":105,"correct":26},{"key":31,"text":103,"correct":22},{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":24,"analysis":33},380779,"测试执行过程的阶段不包括（ ）",[416,418,420,422],{"key":20,"text":417,"correct":26},"初测期",{"key":24,"text":419,"correct":22},"系统测试期",{"key":28,"text":421,"correct":26},"细测期",{"key":31,"text":423,"correct":26},"回归测试期",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":28,"analysis":33},380780,"l以下属于软件测试工具的是（ ）①JTest②LoadRunner③Visual Studio④JBuilder",[428,429,430,431],{"key":20,"text":105,"correct":26},{"key":24,"text":101,"correct":26},{"key":28,"text":226,"correct":22},{"key":31,"text":403,"correct":26},{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":31,"analysis":33},380781,"以下说法不正确的选项包括（ ）。①软件测试不仅仅指测试的执行，还包括很多其他的活动②软件测试是一个独立的流程，贯穿产品整个生命周期，与其他流程并发地进行③应用H模型有利于资源调配，有助于跟踪测试投入的流向④H模型指出，单元测试、集成测试、系统测试不存在严格的次序关系，各层次之间的测试存在反复触发、迭代和增量关系等",[436,437,439,440],{"key":20,"text":99,"correct":26},{"key":24,"text":438,"correct":26},"②③",{"key":28,"text":195,"correct":26},{"key":31,"text":441,"correct":22},"无",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},380782,"软件可靠性管理把软件可靠性活动贯穿于软件开发的全过程，成为软件工程管理的一部分。确定软件可靠性度量活动属于（ ）阶段。",[446,448,450,452],{"key":20,"text":447,"correct":26},"需求分析",{"key":24,"text":449,"correct":22},"概要设计",{"key":28,"text":451,"correct":26},"详细设计",{"key":31,"text":453,"correct":26},"测试阶段",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":20,"analysis":33},380783,"以下关于基于V&V原理的W模型的叙述中，（ ）是错误的。",[458,460,462,464],{"key":20,"text":459,"correct":22},"W模型指出当需求被提交后，就需要确定高级别的测试用例来测试这些需求，当详细设计编写完成后，即可执行单元测试",{"key":24,"text":461,"correct":26},"根据w模型要求，一旦有文档提供，就要及时确定测试条件、编写测试用例",{"key":28,"text":463,"correct":26},"软件测试贯串于软件定义和开发的整个期间",{"key":31,"text":465,"correct":26},"程序、需求规格说明、设计规格说明都是软件测试的对象",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},380785,"（ ）的局限性在于没有明确地说明早期的测试,不能体现“尽早地和不断地进行软件测试”的原则。",[470,472,474,476],{"key":20,"text":471,"correct":22},"V模型",{"key":24,"text":473,"correct":26},"W模型",{"key":28,"text":475,"correct":26},"H模型",{"key":31,"text":477,"correct":26},"X模型",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":28,"analysis":33},380786,"V模型是其有代表意义的测试模型，以下理解正确的是（ ）",[482,484,486,488],{"key":20,"text":483,"correct":26},"V模型认为通过对测试阶段是与开发阶段并行的",{"key":24,"text":485,"correct":26},"V模型是软件开发螺旋模型的变种，它反映了测试活动与分析和设计的关系",{"key":28,"text":487,"correct":22},"V模型造成需求分析阶段隐藏的问题一直到后期的验收反测试才发现",{"key":31,"text":489,"correct":26},"V模型是对W模型的改进",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":20,"analysis":33},380787,"软件可靠性管理把软件可靠性活动贯穿于软件开发的全过程，成为软件工程管理的一部分。确定软件的可靠性目标在（ ）阶段。",[494,495,496,497],{"key":20,"text":447,"correct":22},{"key":24,"text":449,"correct":26},{"key":28,"text":451,"correct":26},{"key":31,"text":498,"correct":26},"软件测试",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":28,"analysis":33},380788,"以下关于测试工作在软件开发各阶段作用的叙述中，不正确的是（ ）",[503,505,507,509],{"key":20,"text":504,"correct":26},"在需求分析阶段确定测试的需求分析",{"key":24,"text":506,"correct":26},"在概要设计和详细设计阶段制定集成测试计划和单元测试计划",{"key":28,"text":508,"correct":22},"在程序编写阶段制定系统测试计划",{"key":31,"text":510,"correct":26},"在测试阶段实施测试并提交测试报告",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":28,"analysis":33},380790,"V模型是其有代表意义的测试模型，以下理解正确的是（ ）。",[515,516,517,518],{"key":20,"text":483,"correct":26},{"key":24,"text":485,"correct":26},{"key":28,"text":487,"correct":22},{"key":31,"text":489,"correct":26},{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":24,"analysis":33},380791,"V模型描述了软件基本的开发过程和测试行为，描述了不同测试阶段与开发过程各阶段的对应关系。其中，集成测试对应的开发阶段是（ ）",[523,525,527,529],{"key":20,"text":524,"correct":26},"需求分析阶段",{"key":24,"text":526,"correct":22},"概要设计阶段",{"key":28,"text":528,"correct":26},"详细设计阶段",{"key":31,"text":530,"correct":26},"编码阶段",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":28,"analysis":33},380792,"V模型描述了软件基本的开发过程和测试行为，描述了不同测试阶段与开发过程各阶段的对应关系。其中，单元测试对应的开发阶段是（ ）。",[535,536,537,538],{"key":20,"text":524,"correct":26},{"key":24,"text":526,"correct":26},{"key":28,"text":528,"correct":22},{"key":31,"text":530,"correct":26},{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":24,"analysis":33},380793,"软件可靠性管理把软件可靠性活动贯穿于软件开发的全过程，成为软件工程管理的一部分，确定软件可靠性度量活动属于（ ）阶段",[543,544,545,546],{"key":20,"text":447,"correct":26},{"key":24,"text":449,"correct":22},{"key":28,"text":451,"correct":26},{"key":31,"text":453,"correct":26},{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":20,"analysis":33},380794,"下面关于软件测试模型的描述中，不正确的包括（ ）。①V模型的软件测试策略既包括低层测试又包括了高层测试，高层测试是为了源代码的正确性，低层测试是为了使整个系统满足用户的需求②V模型存在一定的局限性，它仅仅把测试过程作为在需求分析、概要设计、详细设计及编码之后的一个阶段③W模型可以说是V模型自然而然的发展。它强调：测试伴随着整个软件开发周期，而且测试的对象不仅仅是程序，需求、功能和设计同样要测试④H模型中软件测试是一个独立的流程，贯穿产品整个生命周期，与其他流程并发地进行⑤H模型中测试准备和测试实施紧密结合，有利于资源调配",[551,553,554,556],{"key":20,"text":552,"correct":22},"①⑤",{"key":24,"text":208,"correct":26},{"key":28,"text":555,"correct":26},"③④",{"key":31,"text":438,"correct":26},{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":28,"analysis":33},380795,"以下关于V模型说法，不正确的是（ ）",[561,563,565,567],{"key":20,"text":562,"correct":26},"V模型是瀑布模型的变种，它反映了测试活动与分析和设计的关系",{"key":24,"text":564,"correct":26},"V模型的软件测试策略既包括低层测试又包括高层测试",{"key":28,"text":566,"correct":22},"V模型左边是测试过程阶段，右边是开发过程阶段",{"key":31,"text":568,"correct":26},"V模型把测试过程作为在需求、设计及编码之后的一个阶段",[570,574,577,580,583,586],{"id":571,"name":572,"category":7,"favorite":573},136,"法律职业试卷二(客观题 )",2,{"id":575,"name":576,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":578,"name":579,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":581,"name":582,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":584,"name":585,"category":7,"favorite":8},28,"安全工程师",{"id":587,"name":588,"category":7,"favorite":8},112,"安全生产法律知识"]