[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-380873":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},380873,161,1,"单选题","以下关于验收测试的叙述中，不正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","验收测试由开发方主导，用户参与",true,{"key":16,"text":17,"correct":18},"B","验收测试也需要制定测试计划",false,{"key":20,"text":21,"correct":18},"C","验收测试之前需要先明确验收方法",{"key":23,"text":24,"correct":18},"D","验收测试需要给出验收通过或者不通过结论","验收测试是部署软件之前的最后一个测试操作。在软件产品完成了单元测试、集成测试和系统测试之后，产品发布之前所进行的软件测试活动。它是技术测试的最后一个阶段，也称为交付测试。这时相关的用户和独立测试人员根据测试计划和结果对系统进行测试和接收。它让系统用户决定是否接收系统。它是一项确定产品是否能够满足合同或用户所规定需求的测试。所以不是由开发方主导，而是以用户为主导，故正确答案为A",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 软件评测师","职业资格",0]