[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-380560":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},380560,161,1,"单选题","某开发小组的任务是开发一个大型软件产品的图形用户界面，宜采用（ ）开发过程模型。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","瀑布",false,{"key":16,"text":17,"correct":18},"B","原型",true,{"key":20,"text":21,"correct":14},"C","V模型",{"key":23,"text":24,"correct":14},"D","螺旋","瀑布模型适合需求确定的应用，原型模型适合于需求不确定的情况（如界面的开发），螺旋模型结合了瀑布模型和原型模型两类模型，并加入了风险分析，适合于大型复杂软件系统的开发。V模型只是将瀑布模型中的测试部分做了细化，其最大特点（可能也是最大的缺点）就是“线性执行”，测试的工作在编码完成后才开始进行。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 软件评测师","职业资格",0]