[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-376744":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},376744,157,1,"单选题","系统测试计划应该在软件开发的 ( ) 阶段制定。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","需求分析",true,{"key":16,"text":17,"correct":18},"B","概要设计",false,{"key":20,"text":21,"correct":18},"C","详细设计",{"key":23,"text":24,"correct":18},"D","系统测试","测试计划应该在需求分析阶段就开始制定，并在设计阶段细化和完善，而不是等系统编码完成后才制订测试计划。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)程序员","职业资格",0]