[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-375558":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},375558,153,1,"单选题","按劳动定额编制的综合程度，劳动定额一般可分为( )",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","时间定额和产量定额",true,{"key":16,"text":17,"correct":18},"B","统一定额、企业定额和一次性定额",false,{"key":20,"text":21,"correct":18},"C","现行定额、计划定额、设计定额和不变定额",{"key":23,"text":24,"correct":18},"D","经验估工定额、统计定额、技术定额和类推比较定额","由于劳动定额涉及的范围很广，为了全面反映劳动定额的内容和形式，可从不同的角度和层次，对劳动定额进行不同的区分。B项是按劳动定额的实施范围进行的划分；C项是按劳动定额的用途进行的分类；D项是按劳动定额的制定方法进行的分类。",{"id":6,"name":27,"category":28,"favorite":29},"四级(理论知识、专业能力)","职业资格",0]