[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-375547":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},375547,153,1,"单选题","一个工人在一个工作班(8小时工作时)内应完成40件产品(40件／工日)，假定班产量定额提高到60件／工日，则产品单件工时定额减少到（）工分／件。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","6",false,{"key":16,"text":17,"correct":18},"B","8",true,{"key":20,"text":21,"correct":14},"C","12",{"key":23,"text":24,"correct":14},"D","24","",{"id":6,"name":27,"category":28,"favorite":29},"四级(理论知识、专业能力)","职业资格",0]