[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-373084":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},373084,152,2,"多选题","企业在发生以下（ ）情况，对劳动定额有重要影响时，可不受修订定额的间隔期的限制，对劳动定额及时进行调整。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","非临时性的人员改变",false,{"key":16,"text":17,"correct":18},"B","产品设计结构发生变动",true,{"key":20,"text":21,"correct":18},"C","工艺方法改变",{"key":23,"text":24,"correct":18},"D","设备或工艺装置改变",{"key":26,"text":27,"correct":18},"E","劳动组织和生产组织变更","BCDE","根据有关规定，企业在发生以下情况，对劳动定额有重要影响时，可不受修订定额的间隔期的限制，对劳动定额及时进行调整。 1．产品设计结构发生变动。 2．工艺方法改变。 3．设备或工艺装置改变。 4．原材料材质、规格变动。 5．劳动组织和生产组织变更。 6．个别定额存在明显不合理。 以上情况如属于临时的一次性的改变，可给予补加偏差工时，而不修改现行定额。",{"id":6,"name":31,"category":32,"favorite":33},"三级(理论知识、专业能力)","职业资格",0]