[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-373079":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},373079,152,2,"多选题","劳动定额定期修订的步骤包括（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","准备阶段",true,{"key":16,"text":17,"correct":14},"B","修订阶段",{"key":19,"text":20,"correct":14},"C","审查平衡和总结阶段",{"key":22,"text":23,"correct":24},"D","调查阶段",false,{"key":26,"text":27,"correct":24},"E","拆分阶段","ABC","劳动定额定期修订涉及的面很广，必须在企业主管部门的统一领导下进行。其通常可按准备阶段、修订阶段、审查平衡和总结阶段的步骤进行。",{"id":6,"name":31,"category":32,"favorite":33},"三级(理论知识、专业能力)","职业资格",0]