[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-370917":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},370917,152,1,"单选题","(2016年5月)计划工时定额的计算方法是( ) 。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","计划工时定额=现行产量定额×计划定额完成系数",false,{"key":16,"text":17,"correct":18},"B","计划工时定额=现行工时定额÷计划定额完成系数",true,{"key":20,"text":21,"correct":14},"C","计划工时定额=现行工时定额×计划定额完成系数",{"key":23,"text":24,"correct":14},"D","计划工时定额=现行产量定额÷计划定额完成系数","计划工时定额=现行工时定额÷计划定额完成系数，计划产量定额=现行产量定额×计划定额完成系数。",{"id":6,"name":27,"category":28,"favorite":29},"三级(理论知识、专业能力)","职业资格",0]