[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-370196":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},370196,151,1,"单选题","将分工很细的作业合并，由一人负责一道工序改为几人共同负责几道工序，这样的工作设计措施属于（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工作丰富化",false,{"key":16,"text":17,"correct":14},"B","工作满负荷",{"key":19,"text":20,"correct":21},"C","横向扩大工作",true,{"key":23,"text":24,"correct":14},"D","纵向扩大工作","工作扩大化包括横向扩大和纵向扩大工作。横向扩大工作的手段包括：1.将属于分工很细的作业操作合并，由一人负责一道工序改为几个人共同负责几道工序。2.在单调的作业中增加一些变动因素，分担一部分维修保养，清洗润滑等辅助工作。3.采用包干负责制，由一个人或一个小组负责一件完整的工作。4.降低流水线传动速度，延长加工周期，用多项操作代替单项操作。",{"id":6,"name":27,"category":28,"favorite":29},"二级(理论、专业、综合评审)","职业资格",0]