[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-368777":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},368777,151,1,"单选题","(2016年5月)下列选项中，属于员工培训直接培训成本的是() 。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","培训项目的设计费用",false,{"key":16,"text":17,"correct":18},"B","教材印发购置的费用",true,{"key":20,"text":21,"correct":14},"C","培训项目的评估费用",{"key":23,"text":24,"correct":14},"D","培训项目的管理费用","直接培训成本是指在培训组织实施过程之中培训者与受训者的一切费用总和。如培训教师的费用，学员的往来交通、食宿费用，教室设备的租赁费用，教材印发购置的费用，以及培训实施过程中的其他各项花费等。间接培训成本是指在培训组织实施过程之外企业所支付的一切费用总和。如培训项目的设计费用、培训项目的管理费用、培训对象受训期间的工资福利，以及培训项目的评估费用等。",{"id":6,"name":27,"category":28,"favorite":29},"二级(理论、专业、综合评审)","职业资格",0]