[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-368049":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},368049,150,2,"多选题","战略性衡量项目主要有()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","团队建设",false,{"key":16,"text":17,"correct":18},"B","队伍建设",true,{"key":20,"text":21,"correct":18},"C","制度建设",{"key":23,"text":24,"correct":18},"D","企业文化建设",{"key":26,"text":27,"correct":18},"E","人员发展","BCDE","人力资源部的工作任务(战略性衡量项目)主要有四个，即队伍建设、制度建设、企业文化建设、人员发展。分别将这四个工作任务填写到鱼骨图的“背部”和“腹部”方框内，再根据企业实际情况为每一项工作设计若干KPI，比如围绕“制度建设”的KPI有四个，即制定制度数量、制度发布时间、制度修改次数、制度投诉数量。",{"id":6,"name":31,"category":32,"favorite":33},"一级(理论、专业、综合评审)","职业资格",0]