[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-367952":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},367952,150,2,"多选题","企业战略地图中的“关键衡量项目”包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","财务方面的“提高资产利用率”",true,{"key":16,"text":17,"correct":14},"B","客户方面的“提高最终客户满意度”",{"key":19,"text":20,"correct":14},"C","内部流程方面的“提高技术创新水平”",{"key":22,"text":23,"correct":14},"D","学习与成长方面的“提高员工技能水平”",{"key":25,"text":26,"correct":27},"E","外部流程方面的“提高专业创新水平”",false,"ABCD","企业战略地图中的“关键衡量项目”：最关键的“关键衡量项目”：财务方面的“提高资产利用率”、客户方面的“提高最终客户满意度”、内部流程方面的“提高技术创新水平”、学习与成长方面的“提高员工技能水平”。",{"id":6,"name":31,"category":32,"favorite":33},"一级(理论、专业、综合评审)","职业资格",0]