[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-365845":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},365845,150,1,"单选题","(2016年5月)绩效管理体系设计的前期准备工作不包括（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","明确企业战略目标",false,{"key":16,"text":17,"correct":14},"B","进行工作分析",{"key":19,"text":20,"correct":14},"C","设计岗位胜任特征模型",{"key":22,"text":23,"correct":24},"D","建立考评组织机构",true,"绩效管理体系设计的前期准备工作主要有：明确企业的战略目标，进行工作分析以形成工作说明书，在工作说明书的基础上进行岗位胜任特征模型设计。这些工作主要是为设计绩效指标体系而准备的。",{"id":6,"name":27,"category":28,"favorite":29},"一级(理论、专业、综合评审)","职业资格",0]