[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-359606":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},359606,145,1,"单选题","某项目在城市规划中要求建筑红线后退8m，是指其建筑物最外线从（ ）后退8m。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","用地红线",false,{"key":16,"text":17,"correct":14},"B","城市绿线",{"key":19,"text":20,"correct":21},"C","道路红线",true,{"key":23,"text":24,"correct":14},"D","建筑线","建筑后退红线距离是指建筑控制线与道路红线或道路边界、地块边界的距离。",{"id":6,"name":27,"category":28,"favorite":29},"专业基础","职业资格",0]