[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-350047":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},350047,141,3,"判断题","计算每个单项工程工作量所需时间时，工作时间是指按正常程序和施工总方案中所选用的施工设备的水平，以平均熟练度工人的平均工效计算。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"本题考查的是进度控制。计算每个单项工程工作量所需时间时，工作时间是指按正常程序和施工总方案中所选用的施工设备的水平，以熟练工人的正常工效计算。",{"id":6,"name":21,"category":22,"favorite":23},"开发经营与管理","职业资格",0]