[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-349914":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},349914,141,3,"判断题","经过大量的调查研究，人们发现，对于建安成本，在工程开始时其费用的增长是快速的，达到合同工期的60%时，这种增长达到峰值。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"考点:成本利润率和销售利润率。经过大量的调查研究，人们发现，对于建安成本，在工程开始时其费用的增长是缓慢的，达到合同工期的60%时，这种增长达到峰值。",{"id":6,"name":21,"category":22,"favorite":23},"开发经营与管理","职业资格",0]