[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-349885":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},349885,141,3,"判断题","临时工程包括：工地临时居住房屋、现场供电、给排水工程、场地平整等。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"考点:进度控制。临时工程包括：工地临时居住房屋、现场供电、给排水等。",{"id":6,"name":21,"category":22,"favorite":23},"开发经营与管理","职业资格",0]