[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-349874":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},349874,141,3,"判断题","施工现场的水、电、路通和场地平整属于房地产开发过程的前期工作。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"考点:其他前期工作。除了上述四个主要环节的工作，房地产开发过程的前期工作可能还包括：施工现场的水、电、路通和场地平整；市政设施接驳的谈判与协议；安排短期和长期信贷；对拟开发建设的项目寻找预租（售）的客户；进一步分析市场状况，初步确定目标市场、售价或租金水平；制定项目开发过程的监控策略；洽谈开发项目保险事宜等。",{"id":6,"name":21,"category":22,"favorite":23},"开发经营与管理","职业资格",0]