[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-349539":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},349539,141,2,"多选题","成本计划可分解为（ ）方面。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","材料设备成本计划",true,{"key":16,"text":17,"correct":14},"B","管理费成本计划",{"key":19,"text":20,"correct":14},"C","人工费成本计划",{"key":22,"text":23,"correct":24},"D","不可预见成本计划",false,{"key":26,"text":27,"correct":14},"E","施工机械费用计划","ABCE","考点:成本控制。成本计划可分解为材料设备成本计划、施工机械成本计划、人工费成本计划、临时工程成本计划、管理费成本计划。",{"id":6,"name":31,"category":32,"favorite":33},"开发经营与管理","职业资格",0]