[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-349528":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},349528,141,2,"多选题","下列房地产开发工作中，属于前期工作阶段的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","进行项目的财务评价",false,{"key":16,"text":17,"correct":18},"B","获取项目所需土地",true,{"key":20,"text":21,"correct":18},"C","确定规划设计方案并获得批准",{"key":23,"text":24,"correct":18},"D","对项目的建设工程进行招标",{"key":26,"text":27,"correct":18},"E","提交项目开工申请并获得批准","BCDE","考点:投资机会选择与决策分析。选项A进行项目的财务评价属于投资机会选择与决策分析阶段。",{"id":6,"name":31,"category":32,"favorite":33},"开发经营与管理","职业资格",0]