[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-349310":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},349310,141,1,"单选题","动态投资回收期是指当考虑现金流折现时，项目以（ ）所需的时间。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","经营收入抵偿全部投资",false,{"key":16,"text":17,"correct":18},"B","净收益抵偿全部投资",true,{"key":20,"text":21,"correct":14},"C","全部现金流入抵偿全部现金流出",{"key":23,"text":24,"correct":14},"D","净收益现值抵偿全部投资","本题考查的是动态投资回收期。动态投资回收期是指当考虑现金流折现时，项目以净收益抵偿全部投资所需的时间。",{"id":6,"name":27,"category":28,"favorite":29},"开发经营与管理","职业资格",0]