[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-349208":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},349208,141,1,"单选题","房地产开发项目的质量控制包括决策阶段、设计阶段和施工阶段的质量控制，其中不属于施工阶段质量控制内容的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","对工程采用的配套设备进行检验",false,{"key":16,"text":17,"correct":14},"B","确立有关质量文件的档案制度",{"key":19,"text":20,"correct":14},"C","对原材料的检验",{"key":22,"text":23,"correct":24},"D","控制工程变更",true,"本题考查的是质量控制。工程施工阶段的工程质量控制工作主要包括下列方面：（1）对原材料的检验；（2）对工程采用的配套设备进行检验；（3）确立施工中控制质量的具体措施；（4）确立有关质量文件的档案制度。",{"id":6,"name":27,"category":28,"favorite":29},"开发经营与管理","职业资格",0]