[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-349207":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},349207,141,1,"单选题","开发商申请领取施工许可证时，若建设工期不到一年的，则其到位资金原则上不得少于工程合同价的（ ）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","20%",false,{"key":16,"text":17,"correct":14},"B","30%",{"key":19,"text":20,"correct":14},"C","40%",{"key":22,"text":23,"correct":24},"D","50%",true,"本题考查的是开工申请与审批。关于资金落实的标准。工期不足一年的，到位资金原则上不少于工程合同价的50%；工期超过一年的，到位资金原则上不少于合同价的30%。",{"id":6,"name":27,"category":28,"favorite":29},"开发经营与管理","职业资格",0]