[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-348853":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},348853,141,1,"单选题","关于房屋施工面积的说法，正确的是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","房屋施工面积不包括本期竣工的房屋建筑面积",false,{"key":16,"text":17,"correct":14},"B","房屋施工面积不包括正在施工的非商品房建筑面积",{"key":19,"text":20,"correct":21},"C","房屋施工面积指报告期内施工的全部房屋建筑面积",true,{"key":23,"text":24,"correct":14},"D","房屋施工面积不包括报告期内开工后又停建、缓建的房屋建筑面积","本题考查的是供给指标。房屋施工面积是指报告期内施工的全部房屋建筑面积。包括报告期新开工的面积和上期开工跨入报告期继续施工的房屋面积，以及上期已停建在报告期恢复施工的房屋面积。报告期竣工和报告期施工后又停建缓建的房屋面积仍包括在施工面积中，多层建筑应为各层建筑面积之和。",{"id":6,"name":27,"category":28,"favorite":29},"开发经营与管理","职业资格",0]