[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-348105":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},348105,140,3,"判断题","定额计价方式把施工措施与工程实体项目进行分离，工程量清单计价方式区分实体性损耗与施工措施性损耗。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"定额计价方式为区分施工实体性损耗和施工措施性损耗； 工程量清单计价方式把施工措施与工程实体项目进行分离。",{"id":6,"name":21,"category":22,"favorite":23},"基本制度与政策（含相关知识）","职业资格",0]