[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-347795":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},347795,140,2,"多选题","在工程建设过程中，项目造价控制围绕三大目标（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","投资控制",true,{"key":16,"text":17,"correct":14},"B","质量控制",{"key":19,"text":20,"correct":21},"C","全过程控制",false,{"key":23,"text":24,"correct":21},"D","动态控制",{"key":26,"text":27,"correct":14},"E","进度控制","ABE","本题考查的是工程造价控制的基本原理和方法。在工程建设过程中，项目造价控制围绕三大目标：投资控制、质量控制和进度控制，这些目标是动态的，并且贯穿于项目实施的始终。",{"id":6,"name":31,"category":32,"favorite":33},"基本制度与政策（含相关知识）","职业资格",0]