[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-346487":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},346487,140,1,"单选题","(2017真题) 关于工程量清单计价方法的说法，错误的是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","采用综合单价计价",false,{"key":16,"text":17,"correct":14},"B","工程量清单由招标人编制",{"key":19,"text":20,"correct":21},"C","工程计价依据是各种定额",true,{"key":23,"text":24,"correct":14},"D","计算的工程量不包含工程量的合理损耗","本题考查的是工程造价计价的基本原理和方法。选项C错误，工程量清单计价的主要计价依据是“清单计价规范”，其性质是含有强制性条文的国家标准，清单的项目划分一般是按“综合实体”进行分项的，每个分项工程一般包含多项工作内容。",{"id":6,"name":27,"category":28,"favorite":29},"基本制度与政策（含相关知识）","职业资格",0]